Forum quick links
Heating System G3.1.10 ( c )
CS-2009 EAp2:Minimum Energy Performanceposted by Nicolas Martinez Ochoa on
Hello, I’m working on a Core & Shell office building in Bogota and the baseline system is 8.
Good news from GBCI!
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Mara Baum on
I just got the word that GBCI has reversed their position regarding mercury content in flyash.
Top and trim
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Noriko Nagazumi on
What are top and trim adhesives? Looking up the internet, it seems to be an automotive spray type adhesive. Why does it show up in this architectural adhesive list?
Core&Shell Project
NC-v4 EQc9:Acoustic performanceposted by Julien Richard on
Hello, Is it possible to pursue this credit in a Core&Shell certification in the Innovation section ?
Need Registration guidance for an upcoming Hospital campus
posted by Neha Singhal on
We have a Medical institution coming up at Faridabad (India), which contains various types of building, where the construction would be carried out simultaneously for all the blocks.
Review
posted by Ali Scander on
Hello everyone, I just started working on a LEED 2009 project. I need some advice. The project has already had its design preliminary review and It is now in the design final application.
No Parking Provided - Option 4 Vehicle Sharing
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Pamela Mendez on
Our project is a Residential Building with No Parking provided. A LE/FE Vehicle Contract will be implemented for (2) Years.
No LEED ND v4 RP credits on LEED website?
ND-v4 RPc1:Regional priorityposted by Nate Tsang on
There are no LEED v4 ND RP credits on the regional priority credit lookup on the USGBC website. Can these projects receive RP credits?
LEED-Healthcare: EAc5 M&V Exemplary Performance
Healthcare-v2009 EAc5:Measurement and verificationposted by Megan Shelby on
For EAc5 M&V: The Addenda allows NC, CS and Schools projects to earn an exemplary performance point for pursuing Option 3 (meeting MPR6 through the Energy and Water Data Release Form) in additi
rooftop parking lots
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Noriko Nagazumi on
Hi, Our project building is retail facility and has 4 above grade floors. The entire facility is conditioned. There is a parking floor above the retail floors.