Topic | Recent |
---|---|
Whole Building Reuse New CreditPilot-Credits PC19: Whole Building Reuseposted by Bradley Guy on Dec 6, 2010, 10:10 pm
We hope the consideration of cultural and social aspects of reusing existing buildings through this credit is a valuable addition to the LEED standards. Your inputs are welcome in the development... Last reply: Bradley Guy, Apr 19, 2011, 5:09 pm |
|
Is demolition also part of the ESC-planNC-2009 SSp1: Construction Activity Pollution Preventionposted by Christian Brücher on Apr 6, 2011, 7:42 am
Hello, Last reply: Tristan Roberts, Apr 19, 2011, 3:41 pm |
|
Heat PipesNC-2009 EAc4: Enhanced Refrigerant Managementposted by Christopher Schaffner on Apr 19, 2011, 12:21 pm
Here's a stumper for y'all. A "heat pipe" uses refrigerant migration (without compressors) between two coils for heat recovery. If I am using a heat pipe system, do I include that... Last reply: Bill Swanson, Apr 19, 2011, 2:25 pm |
|
Water Efficiency- Dual Flush Valve GPF Average ExplanationSchools-2009 WEc3: Water Use Reductionposted by Matthew Higgins on Apr 19, 2011, 1:34 pm
I'm currently working on a school renovation that's aiming to achieve a LEED Silver rating. One of the credits that we're after is Water Efficiency Credit 3 (35% water savings). We're currently... Last reply: Renee Shirey, Apr 19, 2011, 2:24 pm |
|
Artificial Turf CoolingSchools-2009 WEc1: Water Efficient Landscapingposted by Lauren Fakhoury on Apr 19, 2011, 1:38 pm
We have a project using artificial turf for the football field so it does not require irrigation, but it does need to be rinsed and cooled down. I don't know the specifics of rinsing the turf but... Last reply: Tristan Roberts, Apr 19, 2011, 1:40 pm |
|
PVC Welding compared to adhesive primer for plasticNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Shevaun Barrie on Oct 26, 2010, 4:50 pm
Can someone please confirm the following... Last reply: Carrie Bradley, Apr 18, 2011, 5:00 pm |
|
Bike PathsSchools-2009 SSc4.1: Alternative transportation - public transportation accessposted by Denise Shimabukuro on Jun 8, 2010, 6:15 pm
This credit requires "dedicated walking or biking lanes to the transit lines that extend from the school building at least to the end of the school property in 2 or more directions without any... Last reply: David Posada, Apr 18, 2011, 3:19 pm |
|
Gross square footage discrepancyNC-2009 EAp2: Minimum Energy Performanceposted by Aliesa Adelman on Apr 13, 2011, 4:32 pm
If the energy model uses net area instead of the LEED definition of... Last reply: Mike Barker, Apr 18, 2011, 5:57 am |
|
Core and Shell DefinitionCS-2009 EAc1: Optimize Energy Performanceposted by Tom Nichols on Apr 16, 2011, 12:24 pm
Can a building without a core HVAC systems be certified under LEED CS? For example, a two story building with a 6,500 ft2 footprint per floor. The developer intends to install 80-100% of... Last reply: Marcus Sheffer, Apr 17, 2011, 2:58 pm |
|
RO Reject WaterNC-2009 WEc2: Innovative Wastewater Technologiesposted by Angela Tana on Feb 18, 2010, 1:40 pm
My understanding of this is that RO reject water that is not considered potable by EPA standards could work. For example many lab projects require RO water for their work. This RO reject water... Last reply: Peter E, Apr 15, 2011, 3:34 pm |