EQc6.1 DocumentationSchools-2009 IEQc6.1: Controllability of systems - lightingposted by Dana Murdoch on Jul 16, 2011, 8:44 pm
Does LEED have a form for inputing rooms/controllability in Version 3 like they did for Version 2.2?? Or do we just make up our own format? Last reply: Kate Randolph, Jul 24, 2011, 1:49 am |
|
Percentage of finished floor complying for the creditSchools-2009 IEQc4.3: Low-Emitting Materials—Flooring Systemsposted by Dario Ibarguengoitia on Jul 7, 2011, 2:27 pm
MY QUESTION IS.. WHAT IF I JUST HAVE 25 % OF THE FINISHED FLOOR AREA USING LOW EMITTING OR CERTIFIED PRODUCTS, AM I STILL EARNING THE CREDIT? Last reply: Kate Randolph, Jul 24, 2011, 12:40 am |
|
what happens when verification turns up changes?NC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Tristan Roberts on Jul 20, 2011, 2:33 pm
It's a requirement for EAp1 that the... Last reply: Susann Geithner, Jul 22, 2011, 5:53 pm |
|
Building Over HangCI-2009 EAp2: Minimum Energy Performanceposted by Simon Sue on Jul 13, 2011, 9:20 pm
We working on a commercial bank and calculating the installed... Last reply: Susann Geithner, Jul 22, 2011, 5:00 pm |
|
SIMULATION METHODCS-2009 EAp2: Minimum Energy Performanceposted by RICARDO GUEMEZ DIAZ on Jul 22, 2011, 2:22 pm
HI, IM RICARDO GUEMEZ FROM MEXICO CITY, I AM IN THE PROCESS OF SIMULATING A WAREHOUSE FOR TENANT LEASING, THE OWNER IN ALL PROJECTS ONLY INCLUDE NATUARAL VENTILATION WITH IEQ-01 COMPLIANCE.... Last reply: Susann Geithner, Jul 22, 2011, 4:43 pm |
|
Permeable or Mulched Paths in CalculationsNC-2009 WEc1: Water Efficient Landscapingposted by Terry Gorski on Jun 30, 2011, 3:36 pm
How would permeable or mulched paths be shown in the LEED Online form calculations? Would they still be considered landscaping, and not irrigated, and left in the calculations? If some of the... Last reply: Susann Geithner, Jul 22, 2011, 3:51 pm |
|
Non Potable Municiply Provided Well WaterNC-2009 WEc1: Water Efficient Landscapingposted by Sam Keehn on Apr 12, 2011, 3:34 am
There is municiply provided water available, called raw water which, as per the standard has less than 5,000 mg/l of Total Disolved Solids. The problem is that this is well water (but drawn on a... Last reply: Susann Geithner, Jul 22, 2011, 3:23 pm |
|
ASHRAE 62.1 MZ calculator acceptable alternative documentationNC-2009 IEQp1: Minimum indoor air quality performanceposted by Courtney Yan on Apr 1, 2011, 2:01 pm
We are working on fixing the built-in calculator for IEQp1/c2. Project teams may provide their own support calculations documentation or use the ASHRAE 62MZCalc spreadsheet to demonstrate credit... Last reply: Courtney Yan, Jul 22, 2011, 2:35 pm |
|
Energy Star Rated EquipmentCI-2009 EAp2: Minimum Energy Performanceposted by Alex Spilger on Jul 22, 2011, 1:50 pm
In regards to products that are included in this calculation, would a projector be included? |
|
ACP for MRc1.1,4,5?Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Nathan Lee on Jul 13, 2011, 4:20 am
I know this is probably the most basic of questions, so please bear with me. I am trying to figure out the application of points for PC1 and if it is an ACP for the MR credits listed above... Last reply: Nathan Lee, Jul 22, 2011, 8:26 am |