Can 10' requirement be met by a combination of mats?

Schools-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Renee Shirey on Aug 26, 2011, 2:58 pm

Due to space constraints, our vestibules were not able to be a full 10' wide between our doors, thus the recessed walkoff mats aren't 10'. Does anyone see any issue with supplimenting the...

Last reply: Allison Beer McKenzie, Aug 26, 2011, 3:03 pm

Peak Demand Reduction Credit NOT Demand Response

Pilot-Credits EApc8: Demand response
posted by Debra Lombard on Aug 26, 2011, 1:15 pm

HI Everyone,

I am working on a LEED-NC v2.2 project which is small but has three technologies that reduce...

Secret Lease

CI-2009 MRc1.1: Tenant space - long-term commitment
posted by David Edenburn on Jul 19, 2011, 11:25 pm

In MR c1.1 and in other credits LEED asks for a (redacted) copy of the lease for term, utility payments, etc. In our case we have been told that the entire lease is confidential and cannot be...

Last reply: Nadav Malin, Aug 26, 2011, 12:41 pm

About Option 3: Measurement

CS-2009 IEQc8.1: Daylight and views - daylight
posted by Diego Prada on May 5, 2011, 4:02 pm

Hello,

If one decides to use option 3 to show compliance with this credit, should the light measurements have to be done in a specific time of the day? This doesn't seems to be the case,...

Last reply: TODD REED, Aug 26, 2011, 10:13 am

is a closed landfill automatically a brownfield?

NC-2009 SSc3: Brownfield Redevelopment
posted by Amanda Redmond-Neal on Aug 12, 2011, 1:42 pm

My project is to be built on top of a landfill that was closed in 1961. I have a very comprehensive "Final Closure and Post-Closure Maintenance Plan" that details required monitoring of the site...

Last reply: Larry Sims, Aug 26, 2011, 9:28 am

Region Where LT Leases are NOT Common

CI-2009 MRc1.1: Tenant space - long-term commitment
posted by Raymond Loo on Jul 27, 2011, 11:12 pm

Has anyone in a region where long term contracts are not common, had experience (of if you have any comments) dealing with USGBC on this credit? Do they consider the circumstances that a 5+5...

Last reply: Raymond Loo, Aug 26, 2011, 9:11 am

Non smoking facility

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Barbara Redmond on Mar 24, 2010, 10:24 am

Hi, My company became a "smoke free" workplace effective January 1, 2010. All the documentation I have read says that we need both a policy and a communication for this pre-req. However, when I...

Last reply: Elliot Powers, LEED AP BD+C, Aug 26, 2011, 4:50 am

Thermal blocks for multifamily residential building

NC-2009 EAp2: Minimum Energy Performance
posted by Emma Eliasson on Aug 12, 2011, 6:51 am

I have a question about thermal blocks in multy family residential buildings.

I'm working with a building that has 4 floors and totly 7 appartments. Floor 1-3 have 2 appartments and the...

Last reply: Nadav Malin, Aug 25, 2011, 11:35 pm

Projected Biomass Boiler

NC-2009 EAc2: On-Site Renewable Energy
posted by Jose Salinas on Aug 4, 2011, 10:22 am

Hi, a company will be working with provisional natural gas boilers, but in a year's time two boilers will be replaced by a biomass boiler whish will be working on sawdust. The fase out of the...

Last reply: Nadav Malin, Aug 25, 2011, 11:25 pm

PV Watts for other countries?

NC-2009 EAc2: On-Site Renewable Energy
posted by Nelina Loiselle on Aug 17, 2011, 5:19 pm

Help Please! Our...

Last reply: Nadav Malin, Aug 25, 2011, 11:23 pm