Operable windows as controlsCS-2009 IEQc6: Controllability of systems - thermal comfortposted by Amanda Ross on Sep 14, 2011, 6:18 pm
Just to clarify: Each operable window counts as one control. Therefore if I have an open office space with 50 people within 20' of the exterior wall, then I need at least 24 windows and one... Last reply: Amanda Ross, Nov 4, 2011, 7:40 pm |
|
HVAC ProtectionNC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Patana Rattananavathong on Oct 11, 2011, 4:14 am
I have a project that don't use any HVAC system. It's all natural ventilation. Is it ok to left the HAVC protection out since there is nothing to protect. Can the project apply for this credit... Last reply: Dylan Connelly, Nov 4, 2011, 7:36 pm |
|
ID credit for 100% outside airNC-2009 IEQc2: Increased Ventilationposted by Nelina Loiselle on May 24, 2011, 2:25 pm
I know there is not an exemplary performance for this credit per say, but I am working on a project where we will using 100% outside air...do you think we could attmept an ID point since we are... Last reply: Dylan Connelly, Nov 4, 2011, 7:25 pm |
|
Bathroom Mechanical VentilationCS-2009 IEQc6: Controllability of systems - thermal comfortposted by Luis Miguel Diazgranados on Sep 21, 2011, 4:58 pm
Hello We are working in a naturally ventilated LEED CS project. Every office and regularly occupied space will have natural ventilation, but Restrooms will have mechanical ventilation by... Last reply: Lauren Sparandara, Nov 4, 2011, 7:11 pm |
|
Thermal comfort for non-regularly occupied spaces.CI-2009 IEQc7.1: Thermal comfort - designposted by Nancy Henderson on Oct 27, 2011, 2:23 pm
We have a project with office and warehouse. The warehouse is strictly for storage and is occupied only intermittantly for short periods. The warehouse is semi-heated (for freeze protection)... Last reply: Dylan Connelly, Nov 4, 2011, 5:55 pm |
|
Strand Woven BambooNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Kenneth Bailey on Feb 21, 2011, 5:49 pm
Our project will use considerable amount of strand woven bamboo. . There are US suppliers that have gone through the FLoorscore certification, but we are thinking of buying direct from one of... Last reply: Lauren Sparandara, Nov 4, 2011, 5:09 pm |
|
Building RenovationCS-2009 EAp2: Minimum Energy Performanceposted by Morteza Kasmaei on Nov 2, 2011, 3:15 pm
Advanced Energy Modeling for LEED states "Existing buildings with less than 50% renovation should not be rotated,...". How can one calculates renovation percentage of an existing building? Last reply: Marcus Sheffer, Nov 4, 2011, 10:17 am |
|
Limited time compliancePilot-Credits SSpc7: Light Pollution Reductionposted by Bill Swanson on Oct 28, 2011, 4:51 pm
I'm working on a project and the owner selected a decorative post top fixture to line the drive into the site. The site is small enough where this fixture is the main site fixture. One look at... Last reply: Glenn Heinmiller, Nov 3, 2011, 10:46 pm |
|
Campus ProjectsSchools-2009 SSc8: Light Pollution Reductionposted by Kimberly Cullinane on Nov 3, 2011, 9:32 pm
Two questions here: (1) The 2010 AGMBC, which is USGBC's guidance for campus projects, shows in table 1A at the end the credits that may be pursued as campus credits - Site Credit 8 does not... |
|
Temporary Structure Phase 1A question for ESC...NC-2009 SSp1: Construction Activity Pollution Preventionposted by Rick Alfandre on Oct 28, 2011, 10:22 am
We have a project that has multiple phases, the first of which is just a the erection of a temporary retail facility. Upon completion of the temporary facility, the majority of the site will be... Last reply: Rick Alfandre, Nov 3, 2011, 7:16 pm |