Is it possible to get post development run off in negative?
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by B MS on
Our project is located in Kathmandu, Nepal and I have a few questions regarding the following points. 1.
Required Number of Construction Inspections?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Benjamin Tressler on
Does LEED specify a required number of commissioning inspections during construction? We are trying to develop a scope based on the minimum requirements of LEED.
Facility Alterations in a garage
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Chris Munn on
We are working with a property that will be undergoing facilty alterations and additions in the parking garage. The property will be adding a small office in their parking garage.
ANSI S12.60-2002 vs LEED Template
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Brian Moran on
The ANSI S12.60-2002 standard requires that core learning spaces, between 10,000 and 20,000 cubic feet, have reverberation times that do not exceed .7 seconds.
LEED 2009 Music Schools
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Brian Moran on
IEQ p3 is a requirement of LEED for Schools 2009.
Trace 700 "LEED Energy Performance Summary Report"
NC-2009 EAp2:Minimum Energy Performanceposted by Erin Adkins on
For those of you that use Trace 700 and are familiar with the fairly new feature, the "LEED Energy Performance Summary Report", that Provides all the information for each section of the EAp2 templa
Tonnage Associated with Energy Recovery Equipment
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Rebekah Burke on
Is the tonnage requirement for the credit supposed to include compressor capacity only or can additional capacity from energy recovery devices be included in the tonnage?
Sites with both green and previously developed areas.
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Eduardo Guzman on
We are working in a project inside a national park. The site used to be occuppied by a fuel station that was demolished and abated 12 years ago.
Denied Credits
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear all, We received the Design Final Review for our project, and a total of 7 credits were denied. 1) If we have initially provided documentation which has not been interpreted correctly by the
Leed 2009 Standalone Auditorium FTE
posted by Gary Mosesman on
We are designing a standalone auditorium addition to an existing high school facility using LEED 2009. We are not disturbing or renovating any of the existing school facility.