How long does the monthly monitoring last for?

Pilot-Credits WEpc17:Cooling tower water use
posted by  William Wong  on 

One of the mentioned requirements is to report results of the amount of potable water used, microbiological levels, blowdown and corrosion on monthly basis, but for how long after occupancy?

1
Tue Feb 8, 2011, 2:24 pm

ASHRAE 90.1 vs T-24 in california

NC-2009 EAp2:Minimum Energy Performance
posted by  Lance Collins  on 

Question: I am working on a new LEED-NC project in california that is using a modular/prefab construction type with mechanical systems that do not require permits via the T-24 code.

1
Tue Feb 8, 2011, 5:19 am

Building shading to a courtyard acceptable?

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  R Jones  on 

I have a building which wraps a round a courtyard on 3 sides and on the fourth is an existing building - this building will be maintained, this is almost all the non roof area for the project.

1
Mon Jan 31, 2011, 5:49 pm

Concrete additives

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Peter Dyro  on 

What is the story with concrete additives?

1
Thu Feb 17, 2011, 7:18 pm

mixed use building project (mainly residential)

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Tarek Dalati  on 

i m working on a mixed use building project (mainly residential) and i have the following question: 1- for offices for example the daily usage is the summation of males usage and females usages b

1
Sun Feb 13, 2011, 1:22 am

Definition of "residential area or neighborhood and more

Schools-2009 SSc2:Development Density and Community Connectivity
posted by  Kimberly Cullinane  on 

Our school project is located to plenty of basic services in the "downtown" area of a rural community.

1
Tue Feb 8, 2011, 2:59 am

Grade 2-5 Elementary School

Schools-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Kimberly Cullinane  on 

Just confirming that we are still eligible for this credit even if our project is a grade 2-5 elementary school. In our case, we would just need to survey all teachers and staff?

1
Tue Feb 8, 2011, 3:07 am

UPS system need to be commissioned?

NC-2009 EAc3:Enhanced Commissioning
posted by  Eric JS   on 

Hi all, UPS system is used as a back up power in case if there is power failure. In that case. UPS itself consume small amount of power.

1
Sun Jan 30, 2011, 8:09 pm

Natural Ventilation

EBOM-2009 IEQc1.2:IAQ Best Management Practices—Outdoor Air Delivery Monitoring
posted by  Melissa Young  on 

Our building is mostly naturally ventilated. One of the seven floors, however, has a central air system installed that serves three densely occupied conference rooms.

1
Tue Feb 8, 2011, 1:26 pm

No BAS.

EBOM-2009 IEQc2.3:Occupant Comfort—Thermal Comfort Monitoring
posted by  Melissa Young  on 

As it says above, achieving this credit without a BAS is difficult. What exactly needs to be done if we don't have a BAS?

1
Tue Feb 8, 2011, 5:28 am