posted by Tristan Roberts on
Lisa, sometimes it is productive to email the reviewer to provide or request clarification at this stage. I would try that as a starting point.
Re: Cancellation of project review
posted by David Posada on
You might try the Feedback form at the top of the page in LEEDonline when you are logged in there.
Qualification of CxA
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by James Chueh on
Quick question, can the contractor of building's BAS (for both the installation and manufacturer of DDC/control components) be designated to be the CxA?
What daylight modeling programs??
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Susan M. Kaplan on
We are trying to evaluate the best way of meeting this requirement through Option 1 - Simulation according to the latest (May 2011) Addenda changes (min. 10 fc on Sept.
Hotel Passengers
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Catalina A on
Are Hotel Passengers considered transients or residents?
Good or no?
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Elizabeth Crenshaw Hammitt on
The way I am interpreting this credit, it would seem that is the project was built post 1994, while a baseline can be calculated, there is no chance of not meeting the PR as long as a satisfactory
Cx for Domestic HW to Point of Connection - Sink only
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Harvard University Green Building Services on
We have a project where a sink was added as part of the scope and tied into existing cold and HW supply lines, with no alteration to any other part of the domestic HW system.