I understand the 12 mos tracking time period can start before the performance period begins but it must also include the performance period. What if your project's performance period is longer than the minimum 3 months, are you required to input energy data into Energy Star Portfolio for the entire performance period? My project's performance period is 7 months so I'm wondering if I'm required to only track the minimum 3 months or will I be required to track the full 7? Thanks.