Forum quick links
Expiration date on Green Label Plus
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Lise Dannesboe on
Hi. Is there a requirement to the expiration date of the certification? We just recevied a carpet with a Green Label plus certificate, which has an expiration date on the 31of decmeber 2017.
Modular and Panelized construction
Mid-Rise-v4 MRc3:Construction waste managementposted by Michael Browne on
How should recycled and total waste be calculated and documented for v4 LEED Homes Midrise projects with off-site construction such as panelized walls, trusses, and modular projects?
Energy Saving from Process Boiler
NC-2009 EAc1:Optimize Energy Performanceposted by sompoche sirichote on
Our project is an existing manufacturing project and we have 1 existing steam boiler and will install 1 new.
Bain Marie
Healthcare-v2009 WEp1:Water use reductionposted by jesmin joseph on
We have a hospital project that is having 1 Bain Marie. In Process water use under which category we have to consider the equipment, food steamer or in others?
Requirement for mechanically-ventilated spaces and Water cooling systems in sheds
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Hanh Truong on
Dear all,
Hope you are doing well.
Use of Whole Building model to predict the energy consumption for each meter
NC-v4 EAc3:Advanced energy meteringposted by Lise Dannesboe on
Hi.
Hope some can help.
Vacant Building - Minimal Occupants to Survey
EBOM-v4 LTc1:Alternative transportationposted by Levi Jimenez on
The MPR for minimum occupancy has been relinquished for LEED EB v4, so we are pursuing a building having only a couple of occupants, in a single tenant building that is currently between tenants.
why necessary to include all buildings in the density calculation?
CI-2009 SSc2:Development Density and Community Connectivityposted by Courtney Royal on
hello...
Denied Exemplary Performance
NC-2009 IDc1:Innovation in Designposted by Jody Boelhauf on
If you are denied an Exemplary Performance in the Design submittal, can you revise that credit to submit an Exemplary Performance for a different credit, to get the maximum 3 Ex Perform?
shower flowrate
Homes-v4 WEc1:Total water useposted by Emmanuel Pauwels on
If multiple-head showers are installed in a single shower compartment, the reference guide states that we need to sum their flow rates and enter the result as one fixture.