PRIVATE SHUTTLE FOR A FACTORY LOCATED IN A UPCOMING INDUSTRIAL DEVELOPMENT WITH NON-EXISTANT PUBLIC TRANSPORTATION
NC-v4.1 LTc5:Access to Quality Transitposted by Amal Venugopal on
The BD+C, NC project we are applying for is a factory with manufacturing unit and office spaces, located in an developing industrial area with no mutimodel transportation facilities .
Can we use both option 1 and option 2?
NC-v4 SSc2:Site development - protect or restore habitatposted by Amanda Cunningham on
Hello,
Has anyone had success achieving 2 points by reaching the 15% threshold for one point and making an off-site financial support donation for a second point?
Water metering of DHW in relation to Janitor's sink
NC-v4 WEc4:Water meteringposted by R Jones on
Hi LEED Users/Experts/Fellows,
Process Chiller in a Lab Building: 90.1-2019 Baseline vs. Proposed
NC-v4 EAp2:Minimum energy performanceposted by Kristy M. Walson on
We're working on a 35,000 SF lab building on a campus district cooling loop. The baseline system type is #5, so there's no chilled water in the baseline.
IPpc100 Passive Survivability and Functionality during Emergencies
NC-v4 INc1:Innovationposted by Noriko Nagazumi on
Hi,
Parking Generation Manual 5th edition
NC-v4.1 LTc7:Reduced Parking Footprintposted by Takayuki Hirota on
In the addenda published on 7/25/2019, Transportation Planning Handbook is replaced with Parking Generation Manual, 5th edition, only in Further Explanation, Bullet 1 and Referenced Standards.
IDc1.3 : Safety First: Cleaning and Disinfecting Your Space
posted by Carlos Sanchez on
I am struggling with finding the green cleaning criteria for this credit. Any help would be greatly appreciated.
Uploading Results from Waste Audit into Arc
EBOM-v4.1 MRp3:Waste Performanceposted by Kristina K on
Hello,
How to define "Total Construction Cost" for credits
NC-2009 MRc4:Recycled Contentposted by Mike Maas on
I'm looking for clearer guidance on how to calculate the Total Construction Cost". Is this to be the estimated cost of construction, or the actual cost of construction?