case 2. Residential and Hospital Projects Only - Requirements
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Veronika Sundberg on
Hi, I have a question regarding case 2. Residential and Hospital Projects Only. In the requirement for the prerequiset 8 bullets are listed that needs to be met.
Energy Bills are the Entire Site and Not Broken Down by Building
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Cynthia Fowler on
My project building is one of 40+ on a company's campus/site. They do not purchase electricity on a building-by-building basis, but for the entire site.
MR Credit - Environmentally Preferable Structure and Enclosure
posted by Keith Lindemulder on
First - PLEASE bring back some kind of number system like MR4, MR5, whatever...these credit names are too difficult to remember and differentiate.
Looking for an example
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Eamon Geary on
In the course of the 30+ LEED projects I have participated in, I have never successfully achieved this credit.
Transient Occupants (specifically students)
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Ashley Chiang on
I understand the different occupancy types and the default fixture use values; however, what I do not understand is how I am suppose to get a somewhat accurate estimation of a occupancy daily total
Poured concrete is not an air
posted by Susan Walter on
Poured concrete is not an air barriers. Your wall section will need a separate air barrier.
Consensus process
posted by Bill Swanson on
"Consensus decision-making is a group decision making process that seeks not only the agreement of most participants but also the resolution or mitigation of minority objections" If LEED is update
Recycled Content/Certified Wood
CI-2009 MRc4:Recycled Contentposted by Méabh Browne on
Hi, I'm working on LEED CI project, which has used products such as panels which are made of steel (20%) which has reycled content (50%) and particle board (80%) which is FSC certified(100%).
Hi
The credit defines comfort
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by SUNG SU KIM on
Hi The credit defines comfort according to the four primary comfort criteria identified by ASHRAE 55-2004: air temperature radiant temperature humidity air speed. A comfort control meeting the c