Forum quick links
Different equipment types or all equipment units in scope
CI-2009 EAp3:Fundamental refrigerant managementposted by Edgar Arevalo on
For a project I'm currently working on, there are 4 CRAC units and 1 split system AC, both water-cooled.
Use of bidets in an office bathroom for NC 2009 project
NC-2009 WEp1:Water use reductionposted by Guillermo Brunzini on
As far as I know, bidets are considered process water fixtures, so do not need be included in the water saving calculation, is that correct?
ID 10209 Mixed-use Building with office not residential use
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Jeffry Magnuson on
Our project is a 122,900 sf building for a single office user. There is 5,000 sf of retail space at the ground floor, currently not leased.
Need help, using new v2009v4_Minimum IAQ Calculator_v03
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Edgar Arevalo on
After adding all the values for four floors I'm working on, I then input the design OA intake flow for each floor's AHU. In the summary tab, 3 out of 4 of the Zone systems meet the required OA int
Rainwater Management
Data-Centers-NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project?
Building Envelope Air infiltration
CS-v4 EAp2:Minimum energy performanceposted by Patrice McVeigh on
Hi All, I am trying to establish if a project can take benefit in the energy model for an improved air infiltration rate for the building envelope over the baseline model.
Building Level Water Metering
EBOM-v4 WEp2:Building-level water meteringposted by sebastian castañeda on
I have a doubt, we have a project of a complex of 3 buildings that is located inside a University Campus.
Diverse Uses within a Shopping Center
CS-v4 LTc4:Surrounding density and diverse usesposted by Frank Sherman on
The planned C+S development is a shopping center that will include retail, restaurants, a grocery store and movie theater.
New to LEED Submitals
posted by Joel Clonch on
I have a mill-work submittal that requests : LEED Submittals: 1. Product Data showing VOC content does not exceed 30 g/L for wood adhesives and 80 g/L for contact adhesives. 2.
Solar panels serving another building
EBOM-2009 SSc7.2:Heat island effect - roofposted by Rasita Masalskyte on
If solar panels on our building‘s roof are serving another building‘s energy needs, can we still exclude these solar panels from calculations as mechanical equipment?