Forum quick links
Non-linear primary direction of travel.
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Michelle Halle Stern on
Our entry includes a centered revolving door with people doors on either side.
MRpc103 Integrative Analysis of Building Materials
NC-v4 INc1:Innovationposted by Lisa Bolle on
As our project team was performing the analysis of three products, we realized that another potentially useful strategy would be to compare three similar products and use the integrative analysis w
Non-technical question (kind of a rant) about OneClick LCA
posted by Jonathan Weiss on
A brief non-technical rant about OneClick LCA - from someone who is not actually USING the tool, but lobbying for its access. Wondering if you all have better intel, or if it is just me.
Alternatives to Engineered Stone?
posted by Francesca Joyce on
Happy New Year!
I haven't seen this topic come up in the forum, but might have just missed it.
Pilot credit Requirement
Pilot-Credits SSpc55:Bird collision deterrenceposted by on
Commenting to comply with credit requirements. Credit language is clear and the team was able to implement without trouble. The project used a highly reflective glazing to comply.
High Rise Residential
NC-v4 EAc3:Advanced energy meteringposted by Megan White on
We have a 24 story high rise residential apartment project that wants to pursue this credit however we are looking for guidance as this seems more geared towards commercial office projects with mul
Could cycle paths count as open space?
NC-v4 SSc3:Open spaceposted by Rachael McGinley on
Future open space preservation- Campus project
NC-v4 SSc3:Open spaceposted by Andy Rhoades on
My question is regarding a multi-phased campus project. Are we able to count future planned open space towards the credit threshold, and if so, what documentation would this require (i.e.
Lighting Control in blood draw spaces
Healthcare-v4 EQc6:Interior lightingposted by Heather Belsey on
For the lighting credit you need to have individual controls at 90% of patient positions. LEED defines patient positions as:
Green walls
NC-v4 SSc3:Open spaceposted by Santiago Avila on
Hello everybody,
I would like to confirm if green walls counts as green area for open spaces, clarly without any artificial/fake plants.