Satisfaction of the authority

NC-v4 LTc3:High priority site
posted by  Florian Schmidtchen  on 

Dear all, can anyone explain "satisfaction of the authority"? Under German law the property owner is obligated to remediate all contaminations.

4
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Thu Mar 12, 2020, 4:28 pm

"Dirt cheap Net Zero"--looking for co-presenters for August conference

Green Commons
posted by  Z Smith  on 

We are looking for colleagues from other firms to join a conference session proposal on "Dirt cheap Net Zero" for the ASHRAE / IBPSA conference (August 12-14, 2020, Chicago). 

0

Option 2 - Leadership Extraction Practices

CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Sara Johansson  on 

How can structure and shell only be allowed to contribute towards 30% of the compliant building material cost, when 25% is enough to fullfil this credit?

8
Thu Mar 12, 2020, 12:34 pm

Calculate illuminance intensity for sun (direct component) and sky (diffuse component) for clear-sky

CI-v4.1 EQc7:Daylight
posted by  Amal Venugopal  on 

Hi,

We are doing the day lighting simulation for office building under LEED ID+C v4.1 rating system. We have opted the option 2 simulation approach to meet the credit requirements.

1
Thu Mar 19, 2020, 7:36 am

Additional scope to test...what if there is no contamination found?

NC-v4 LTc3:High priority site
posted by  emily reese moody  on 

We have a project that is not required to do site contamination testing, and does not believe there is any reason for the site to have contamination (they have always owned the site), so they did n

6
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Thu Mar 12, 2020, 6:17 am

UPLOAD button not available?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Jenni Betancourt  on 

We are at the stage where we are responding to the GBCI Reviewer's comments on the Design/Construction Submittal.

7
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Wed Mar 11, 2020, 11:19 pm

Outdoor Ice Rink Energy Performance

NC-v4 EAp2:Minimum energy performance
posted by  Ralph Bicknese  on 

We are looking at LEED for a multi-purpose sports facility with indoor space and an outdoor ice rink that is not enclosed.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Mar 11, 2020, 9:16 pm

Group or single project for Warehouse

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sofia Barahona  on 

We are currently working on a warehouse which has a total of 12,704.13m2, the project consist of a building of storage and operative offices with a total of 12,516.67m2 and a small separate spaces

1
Sun Mar 15, 2020, 12:53 pm

62 2010 MZ Calc excel for LEED v 4.

CI-v4 EQp1:Minimum indoor air quality performance
posted by  Sadaf Alam  on 

Hi ,

 

Does anyone have 62 2010 MZ Calc excel for LEED v 4. 

1
Sat Jun 6, 2020, 12:20 am

Acoustic Performance

NC-v4.1 EQc9:Acoustic Performance
posted by  Kyle Roth  on 

Is this credit to require all of the structure (walls, floor, floor slab, roof ect.) to be accounted for in measuring for this credit? Or just the walls?

0