Forum quick links
Site with a mix of developed and undeveloped areas
NC-v4 SSc4:Rainwater managementposted by Ricardo Sá on
Dear All,
Option 1 requires on-site management of the runoff from the developed site for the 95th or 98th percentile of local rainfall events.
Difference between Reference Guides of BD+C and ID+C
posted by Thomas Tran on
Dear All,
"20 Different permanently installed products"
NC-v4.1 MRc2:Environmental Product Declarationsposted by James Keohane on
Question about how to apply the requirement for "20 different pemanently installed products"? Can I for example use more than one paint type from Sherwin Williams? Pushing the thought f
Occupant Comfort Survey and Students
Schools-NC-v4 INc1:Innovationposted by Bryna Dunn on
In v4, the innovation credit language states: "The responses must be collected from a representative sample of building occupants making up at least 30% of the total occupants." In past versi
Deadline to respond to preliminary review
posted by ZHANG Yating on
Hi LEED Users,
Daylight Control In Hotel Rooms
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Dear All,
Regarding the mandatory requirements of ASHRAE 90.1 for automatic daylighting control.
Modelling Chilled water pump Power for the Baseline
CS-2009 EAp2:Minimum Energy Performanceposted by Indochine Engineering VN on
Hi LEED experts,
Number of Lux Measurements in a High Rise Office Tower
CS-v4 EQc4:Daylightposted by Christine Recke on
In a Core and Shell project Office Tower that is over 50 stories, the rule is still measure all regularly occupied spaces in the building?
No exterior lighting
EBOM-v4 SSc4:Light pollution reductionposted by ERM Korea on
Can it achieve a point by not having any of exterior lights?
The project building does have small landscape and and rooftop garden.