Forum quick links
Switch Optimize Process Water use V4.1
CS-v4.1 WEc3:Optimize Process Water Useposted by Michaël Briffaz on
Hi Everyone,
No-irrigation documentation
NC-v4 WEp1:Outdoor water use reductionposted by Alexia Anastassiadis on
Hi all,
What sort of documentation do you submitt to demonstrate no need for irrigation in international projects? (i.e. we don´t have a tool like the USDA hardiness zones)
LEED ID+C Commercial Interiors vs BD+C?
posted by Rick Alfandre on
We are reviewing a project looking to register under LEED ID+C Commercial Interiors v4.
LEED Campus for Multi-rating systems
posted by Hashir Usman on
Dear all,
Total Gross Area: does the roof area counts?
CS-2009 PIf2:Project Summary Detailsposted by Gabriella DUva on
When calculating the "Total Project Building Gross Area" required by the PI form 2: does the roof area level counts?
Gross Floor Area: Areas to exclude
CS-2009 PIf2:Project Summary Detailsposted by Silvia Ruiz on
Hello
I'm calculating the gross floor area for my project but I'm doubtful if I should include this areas:
Clean room ventilation and systems - Process Load
NC-v4 EAp2:Minimum energy performanceposted by Luis Andrade on
Hi all,
Reintroduction
posted by Megan Zack on
Hello - I have met several of you virtually over the last couple years.
Corgan Director of Sustainability Job Opening
posted by Ellen Mitchell on
I don't have any direct affiliation with this role other than a former colleague asked if I would share the job posting for Director of Sustainability at Corgan with my network - that's you!&n