Forum quick links
CDWM - Recycling Facility Diversion Rate
NC-v4 MRp2:Construction and demolition waste management planningposted by Preethi Sreeraj on
It is clear from the guidance that a project will need the diversion rate of the Comingled facility that is regulated by local or state agency, but is this applicable for source separated wast
On-Site waste-to-energy technology for existing stadiums/arenas/venues.
posted by Sagar Desai on
Hello,
Guidance for approaching outdoor swimming pools for a municipal project
posted by Edward Reifenstein on
We are designing a community center and aquatics facility with several outdoor pools.
Location of outside airflow measuring station inside the HVAC unit
NC-v4 EQp1:Minimum indoor air quality performanceposted by Edgar Arevalo on
We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space. Since there is no recirculating air getting reintroduced to the supply side, the MEP engine
LEED Registration for 2 buildings on same plot
posted by Pulak Goyal on
I have two buildings going for LEED v4.1 O+M Existing Buildings certification. They are connected with a bridge on 1 level.
Problems with v4v4 1_Indoor Water Use Reduction Calculator_v05.1.xlsm
Schools-NC-v4 WEp2:Indoor water use reductionposted by Alexia Anastassiadis on
Hi all!
Biophilic Design as a Guiding Principle in Sustainable Design
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Carla Roubaud on
Securing this credit goes beyond ticking boxes; it requires thoroughly blending natural elements into the architecture.
Shower in Mixed Use Residential/Retail
NC-v4 LTc6:Bicycle facilitiesposted by Michelle Rosenberger on
I am confused about the shower requirement in a residential building that has retail space on the ground floor.
LEED v4 Heat Island Reduction - include elevator shafts and stairwell enclosures in roof calcs?
NC-v4 SSc5:Heat island reductionposted by Julie Baines on
Hi all, I am working on a major renovation of an existing downtown campus building. The entire roof of the building is being redone with white TPO.