Forum quick links
Question regarding minimum filter requirements
NC-2009 IEQp1:Minimum IAQ Performanceposted by Henry Delgado on
The questions is in regards to the LEED Reference guide for green building design and construction, 2009 Edition, IEQ Prerequisite 1 - Minimum indoor air quality performance (pg 407), Case 1 - Mech
Baseline Type and number of chillers
CI-v4 EAp2:Minimum energy performanceposted by Gabriela Mena on
Hi,
LDP for EBOM Recertification - Pros and Cons?
posted by Kimberlee Dobbins on
I know of one building attempting to use LDP for EBOM recertification. Has anyone successfully achieved recertification and willing to share the experience?
infirmary
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
We are dealing with an educational building and we are considering ASHRAE 62.1-2010. Inside there is an infirmary.
Which occupancy category shall I consider for that space?
Some questions about temporary parking spaces
NC-v4 LTc7:Reduced parking footprintposted by Jianzhushe Lili's on
Dear all:
Modelling Fan Coil Units in Tenant Areas with no Lease Agreements
CS-v4 EAp2:Minimum energy performanceposted by Michael Hammond on
I’m working on a LEED v4 C&S office building and there are no tenant lease agreements associated with the tenant area mechanical systems (Client does not want to impose any restrictions on obta
LEED v4 projects that demonstrate compliance using ASHRAE 90.1-2013
NC-v4 EAc2:Optimize energy performanceposted by Vina Vales on
Is there a different Table 1: ASHRAE 90.1-2013 Appendix G percentage Improvement that we can use for those projects under LEED v4 but using ASHRAE 90.1-2013?
If so, please forward.
Staff resources for LEED ND Projects
ND-Plan-v4 MPR2:Must use reasonable LEED boundariesposted by Devani PERERA on
Hi,
Is it necessary to have a Leed Green Associate or a Leed AP ND to propose one project to the certification LEED ND (plan or built) ?
Thanks for your help.
Regards.
Breakdown in question...
NC-v4 EAc3:Advanced energy meteringposted by emily reese moody on
I'm funneling this question on behalf my mechanical engineer:
Our total breakdown of energy use is as follows:
Project specific diversion vs facility average diversion
NC-v4 MRc5:Construction and demolition waste managementposted by Eesmyal Santos-Brault on
Under "Onsite separation vs.