Forum quick links
Lighting control in prison cells
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Sananda Mukherjee on
There are 3 levels of lighting that the lighting can adjust to within the prison cells in a jail but the inmates will not have the capability to control their own lighting, the controls w
Private / Public Fixtures for Outpatients
Healthcare-v2009 WEp1:Water use reductionposted by CT G on
We are working on a clinic which was both inpatients and outpatients.
Zero Construction Waste Report
posted by Emily Naud on
Hi All,
I just tried to post a minute ago but it said my connection was lost, so I'm starting over again. You may see two similar posts from me.
Option 1 Accessible Floor or Ceiling
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Jonathan Weiss on
Anyone with experience on how this option works? For a project where we have acoustical ceiling systems over more than 50% of the ceilings, does this apply? How do we define "not entang
What's up with LEED v4 version of School as a Teaching Tool?
Schools-2009 IDc3:The School as a Teaching Toolposted by Nadav Malin on
Does anyone know what's going on with the v4 version of this credit? In 2009/v3 it was clearly its own credit, but in v4 it seems to be in limbo.
Great new zero-energy school video available
Schools-2009 IDc3:The School as a Teaching Toolposted by Nadav Malin on
We're really proud of this video we (at BuildingGreen) created for the U.S. Department of Energy with Storyshop Films.
Using ASHRAE 90.1-2013 as reference standard for v4 projects
Schools-NC-v4 EAc2:Optimize energy performanceposted by Gail Vittori on
For v4 projects, is there any adjustment in point allocation for projects using 90.1-2013 ILO 90.1-2010?
Excavation material from LEED Project is moved outside the LEED boundary on adjacent land.
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Adrian Arenas on
Hello Everyone
Assessment Influence on Design
NC-v4 SSc1:Site assessmentposted by Summer Minchew on
My question ties back to the FAQ response: "The credit requires that projects assess each feature, but it does not require that every assessment influence the project design." This credit was denie