Functional Difference between LEED Neighborhood Development (v4) and Communities (v4.1)
posted by Nina Swanson on
Hello LEED experts, I have a very pressing question which im hoping to gain insight. What is the functional difference between LEED ND and LEED Community?
Occupancy Discrepancy Between Thermal Heat Load Summary and LEED Calculation
CS-v4 EQp1:Minimum indoor air quality performanceposted by Alefiya Bhiwandiwala on
I'm working on a project in UAE, where the thermal heat load summary considers an occupancy of around 1,500 people.
Baseline for unconditioned building
NC-v4 EAp2:Minimum energy performanceposted by Amgad Khattab on
we have a dormitory building with mechanical ventilation (treated with cooling to reach 20 C and a CAV reheat terminal ) only associated with ceiling fans, shall we model the baseline with no
Calculator Protected sheet v4 1_Bldg products calculator_v04
NC-v4.1 MRc2:Environmental Product Declarationsposted by Allison Para on
Hello LEED Experts,
Please help me with the v4.1 Calculator for (MR) Building products calculator. I am unable to make any changes or edits.
Sub-Metering for small service buildings
NC-v4 EAc3:Advanced energy meteringposted by Cyle Sheppard on
I have a question from our Electrical Engineer that I am unsure on.
Composite Wood - CARB Phase II
NC-v4 EQc2:Low emitting materialsposted by Brad Newkirk on
Does plywood that meets CARB Phase II requirements for formaldehyde emissions automatically meet the requirements of this credit for Composite Wood?
Polished Concrete Floors vs. High SCM Slabs
posted by Max Driscoll on
On a large sports project, we worked with the structural engineer to spec low carbon / high SCM concrete mixes.
Terrazzo?
CS-v4.1 EQc2:Low-Emitting Materialsposted by Maria Porter on
I was under the impression that terrazzo could be counted as inherently non-emitting, but just received a review comment that it was not. I think I based it on the wording in v2009.
Option 2 (prescriptive path) documentation?
NC-v4 EAp2:Minimum energy performanceposted by Erica Downs on
I have a project attempting EAp2/c2 via the prescriptive pathway, Option 2, 50% AEDG. The only "required documentation" listed in the Reference Guide is the completed AEDG tables, which seems
LEED MR Credits and Division 13
posted by Ralph Bicknese on
We are working on a LEED B+C (non healthcare) project that has a clean room and trying to determine whether or not the clean room "unit"/prefab wall panel systems and ceiling panel systems should b