Forum quick links
Battery Storage w/PVs...how does it impact points on EAc2, EAc1?
NC-2009 EAc2:On-Site Renewable Energyposted by Andrea Traber on
Electric battery storage is becoming cost effective in CA with our incentive programs and we are strongly considering it on a few projects, especially those with solar PV.
Recycled Content - Cut Sheet
CS-2009 MRc4:Recycled Contentposted by Carine Guenand on
Is an email from the supplier confirming post-consumer and pre-consumer recycled content of the material, sufficient as a cut sheet?
Toilet Light Shut-Off
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi, bathrooms can have a manual shutdown device for lighting? It is mandatory that all toilets automatically switch off the lighting? Thanks
Pedestrian Access
CI-2009 SSc2:Development Density and Community Connectivityposted by scott mccarthy on
I just got my Preliminary Design review comments...I successfully documented the 10 basic services and residential zone however did not show unobstructed pedestrian access connecting everything tog
Constant Volume RTUs and Energy Star Label
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Sunayana Jain on
I am not clear from CPG whether VAV is required for Option1 (Equipment Efficiency - 5 points). I have Constant Volume RTUs serving the tenant space. All of them have supply fan less than 5 HP.
Toilet Light Shut-Off
CS-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi, bathrooms can have a manual shutdown device for lighting? It is mandatory that all toilets automatically switch off the lighting? Thanks
Renewable Energy question: BD+C
NC-2009 EAc2:On-Site Renewable Energyposted by Farah A. on
In order to achieve 3 pts in the On-Site Renewable Energy credit, what percentage of renewable energy must be provided in regard to the total energy consumption? 1.5% 6% 4.5% 3 % The answer given
CPU
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Sunayana Jain on
Are CPU's also need to qualify Energy Star rating? In my case, monitors have Energy Star label.
Clarification on C&S and MEP Systems
CS-2009 EAc1:Optimize Energy Performanceposted by Emmanuel Gee on
Hello, This is our first Core & Shell project and we have a tenant ready for a two story commercial space.
Mechanically ventilated spaces and naturally ventilated spaces
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
As baseline model I have to model System 6 according to Table G3.1.1A. On a floor the spaces that have windows are naturally ventilated while the internal spaces are mechanically ventilated.