Log in
Forum » WELL Building Standard Discussion Forum
Topic

WELL Continuing Education

WELL v1 Building Standard Tip Sheet
posted by Pippa Lee on Mar 13, 2017, 12:29 pm

Hi all,

I had a question regarding WELL CE credits, and more specifically the 6 WELL specific units you must achieve for ongoing AP certification. Given I am not working in an office that...

Last reply: Lida Lewis, Aug 3, 2017, 12:04 pm

Feature 01 Air Quality Standards- how to ensure you'll meet it

WELL v1 Building Standard Tip Sheet
posted by Katie Lowery on Jun 14, 2017, 11:01 am

Hi, I'm in the beginning stages of administrating my first WELL project. I'm trying to get my head wrapped around how to ensure that the preconditions are met through design specifications. I'm...

Last reply: Lida Lewis, Aug 3, 2017, 11:57 am

Partitioned office space clarification

WELL v1 Building Standard Tip Sheet
posted by Carina Clark on Apr 12, 2017, 6:36 pm

For WELL 80 SOUND REDUCING SURFACES, Part 2: Walls; c. Partitioned Office spaces:
Do these partitions need to surround the occupant on three sides, or, can it just be in front of the user?...

Last reply: Dionisio Franca, Jul 25, 2017, 1:37 am

Overlap between LEED v4 and WELL

WELL v1 Building Standard Tip Sheet
posted by Nirwair Singh Bajwa on May 10, 2017, 5:28 pm

Hi, I am working on a WELL project which has registered for LEED v4 ID+C. Is there a document or study which can summarize overlap between LEED and WELL and points that can be earned...

Last reply: Nirwair Singh Bajwa, May 12, 2017, 1:38 pm

Definition of fried

WELL v1 Building Standard Tip Sheet
posted by Dionisio Franca on Feb 20, 2017, 12:48 am

Hi! Under no 38 - Fruits and Vegetables we have "At least 50% of available options are fruits and/or non-fried vegetables."
Does fry here includes stir-fry? Or is it mentioning deep-fry...

Last reply: Brian Salazar, Mar 14, 2017, 3:58 pm

77 Olfactory Comfort

WELL v1 Building Standard Tip Sheet
posted by Carina Clark on Mar 13, 2017, 12:17 pm

If a commercial project is looking to provide a kitchen/break room, some options include a separation by negative pressurization and hallways. Am I understanding correctly that this means, this...

Last reply: Brian Salazar, Mar 14, 2017, 3:53 pm

Well for condos!

WELL v1 Building Standard Tip Sheet
posted by H Agarwal on Jun 3, 2016, 8:58 am

As the everything starts from top and gradually bottoms down. I wish Well for individual homes could be available . The Ultra HNI if once convinced will follow itup for the rest of their...

Last reply: Pippa Lee, Mar 13, 2017, 12:33 pm

WELL Certification Estimation Calculation

WELL v1 Building Standard Tip Sheet
posted by Carina Clark on Jan 23, 2017, 4:46 pm

Our team is trying to estimate about where our project is in achieving WELL certification (and at what level) prior to registration. In reviewing page 17 of the WELL Building Standard, we have...

Last reply: Dionisio Franca, Feb 17, 2017, 12:06 am

WELL AP Exam center in India

WELL v1 Building Standard Tip Sheet
posted by Nowfal Kunju Muhammed on Dec 24, 2016, 3:08 am

Is there any exam center in India for WELL AP?

Last reply: John Mlade, Feb 14, 2017, 12:30 pm

Feature 65- Activity Incentive Program

WELL v1 Building Standard Tip Sheet
posted by Dave Hubka on Jun 28, 2016, 5:47 pm

The WELL Assessor on our project has stated that "Part 1f is slightly different in that it is a demonstration of employee participation, and is looking backwards". therefore simply providing free...

Last reply: Dave Hubka, Dec 2, 2016, 1:53 pm