Forum quick links
Calculating Stormwater Treatment Volumes
NC-v4 SSc4:Rainwater managementposted by Joshua Radoff on
After going through the Online Reference Guide for this credit a few times, and then watching the two videos that illustrate how to calculate the various parameters (and feeling like I was running
MRc4 vs MRc7
Healthcare-v4 MRc7:Furniture and medical furnishingsposted by John Long on
We are an FSC-certified (brand new) casework manufacturer. We are submitting our very first FSC job. This job is also a LEED project.
free waste heat from outside of LEED project for heating
NC-2009 EAc1:Optimize Energy Performanceposted by Mónika Egyed on
Our project is a small office building in Europe, on site of a great industrial plant with the same owner. The office building aims to achieve LEED Gold certification, while the plant does not.
Carbon Offsets (Green-e Equivalent)
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Henrique Mendes on
We have a client that wants to buy carbon credits from a project in Brazil, and since green-e do not have auditors here, there are no Brazilian companies certified under the Green-e climate standar
Several separate baseline HVAC systems on one floor.
NC-2009 EAp2:Minimum Energy Performanceposted by Nina Starynina on
Hello colleagues, I have a question from our energy modelling team. The question is about baseline HVAC systems modelling.
Transit Service Tables
ND-v2009 PIf3:Project Location and Base Mappingposted by Michael Smithing on
Where can I find the Transit Service Tables that are referred to on the form?
Ventilation for parking garage
NC-2009 IEQp1:Minimum IAQ Performanceposted by FABIO VIERO on
Hi All, I have a question about a project under LEED certification. We are designing the ventilation of one floor below-grade parking garage, situated below an open area adjacent to an office bui
LEED-NC or LEED for Homes (and v3 vs v4)?
posted by emily reese moody on
Hello, I've tried calling USGBC, who told me to email certinfo@usgbc.org. I did that a little over 2 weeks ago, and have yet to get a response.
Combining Option 1 and Option 2
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Lyle Axelarris on
Has anyone had any experience combining the approaches in Option 1 and Option 2 to achieve this credit? We plan to use economizer cooling for most of our cooling needs.
How does the formula work with mixed new and existing projects?
CS-2009 EAc1:Optimize Energy Performanceposted by Charles Nepps on
Our project building is 75% existing and 25% new construction. When the credit form calculates the EAc1 points, it is done based on a weighted average, which makes sense.