CI-2009 EAc3:Measurement and Verificationposted by Monica Hue on
Is there are is an initial fee that must be paid upfront when the tenant signs the lease to pay for energy use? If there is this fee, how much does that typically cost?
Licensed Professional
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Tam Kin Hung on
To comply with the requirement of this prerequisite, data verification checklist and SEP should be submitted.
Minimum Energy Performance Data Center Calculator
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
Hello everybody, For a data center project we have used the “Minimum Energy Performance Data Center Calculator” to claim saving from the IT load.
Extraction system for storage area
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Luis Miguel Diazgranados on
Project location: Outside Bogotá, Colombia I am currently working on a CS project (a warehouse more specifically) located in a suburban region, near Bogotá-Colombia, called Tocancipá.
DCV modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The project I'm modeling has several DOA AHUs. Every AHU has a single CO2 sensor located on the return duct next to the unit.
Energy modeling
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Muzammal Abbas on
Dear Sir, I want to know that is it mandatory to provide energy modeling for commercial interior project's for LEED submission, Now my second question is that i am using a HAP 4.8 and eQUEST softwa
Natural Ventilation
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Benjamin Cullum on
Under option 2 How do you determine how many sampling stations are needed in a building that is uses Natural ventilation?
On-site waste water treatment in LEED V4
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Lorne Mlotek on
Are Lagoons, or septic tanks rewarded at all in LEED V4? This credit was omitted from the new version and I am curious if I installed an on-site waste water treatment facility onsite which dischar
Any HAP Expert?
NC-2009 EAp2:Minimum Energy Performanceposted by Khaled Fouda on
I use Carrier-HAP and according to ASHRAE 90.1 G.1 #4, all baseline HVAC fans should be running continuously when the space is occupied and cycled when the space is unoccupied.
Occupants estimate according reference building
CS-2009 PIf3:Occupant and Usage Dataposted by LEED Pro Consultant on
Hello, We are working on a warehouse project that is intended for rental, therefore we don´t have the occupancy for the building since the tenant will adapt the space according to his necessities.