Hello everybody,
For a data center project we have used the “Minimum Energy Performance Data Center Calculator” to claim saving from the IT load. Accordingly, the IT and electrical loads have been used as input in the energy model. However, the corresponding energy consumption from the energy model is less than that automatically calculated within the “Minimum Energy Performance Data Center Calculator”, although the IT schedule has been set to operate 24/7. What should be done in this occasion?
In addition, are we supposed to submit a model with the initial IT load and relevant savings?