set top boxes and other lab test equipmentCI-2009 EAp2: Minimum Energy Performanceposted by Gail Napell on Nov 9, 2014, 1:25 am
We have a client who runs tests on Set Top Boxes in a test lab for their customers to determine problems and fix them. They have literally a hundred thousand STBs - they have to have at least one... Last reply: Marcus Sheffer, Nov 10, 2014, 9:43 am |
|
More Stringent Local Code QuestionsCI-2009 EAp2: Minimum Energy Performanceposted by Matthew Catterall on Nov 5, 2013, 10:12 am
Regarding lighting power... Last reply: Bernie Hont, Oct 30, 2014, 3:54 pm |
|
6.5.3.1 Fan power limitation for a VRF + DOAS systemCI-2009 EAp2: Minimum Energy Performanceposted by Zonda E. Team on Sep 7, 2014, 6:32 pm
Hi there, should I consider DOAS fan power as part of the total system fan power? The DOAS transports unconditioned outside air to the mixing plenum of the VRF indoor unit. Last reply: Zonda E. Team, Sep 9, 2014, 12:00 pm |
|
ASHRAE 90.1 2007 Section 9.4.1 Automatic Lighting ShutoffCI-2009 EAp2: Minimum Energy Performanceposted by Ashonta Langdon on Jul 15, 2014, 11:32 am
Hello! We're working on a TI office project of less than 5,000 sf in a building that is larger than 5,000 sf. I had a question about ASHRAE 90.1 2007 sections 9.4.1.1 and 9.4.1.2 about... Last reply: Marcus Sheffer, Jul 16, 2014, 2:46 pm |
|
Energy StarCI-2009 EAp2: Minimum Energy Performanceposted by LEED Pro Consultant on Jun 19, 2014, 10:34 am
Hello! If we choose the performance option (Section 11), do we still have to comply with the 50% rated power Energy Star?? Thanks!! Last reply: LEED Pro Consultant, Jun 19, 2014, 5:18 pm |
|
No change in HVAC?CI-2009 EAp2: Minimum Energy Performanceposted by John-David Hutchison, LEED AP BD+C, PMP on May 13, 2014, 2:05 pm
I have a client investigating LEED-CI for a upcoming project. Interior fit up, but no change in HVAC system for a building built in the 1980's. Does this prerequisite subscribe to... Last reply: Marcus Sheffer, Jun 19, 2014, 10:42 am |
|
Audio Visual Equipment part of prerequisite?CI-2009 EAp2: Minimum Energy Performanceposted by Saju Varghese on Apr 1, 2014, 10:39 am
Does audio visual equipment need to be included into the appliances requirements including projectors, speakers, led display, interactive displays, etc? Last reply: Marcus Sheffer, Apr 3, 2014, 7:08 pm |
|
ASHRAE forms for vrv systemsCI-2009 EAp2: Minimum Energy Performanceposted by Yaser Al Sharif on Mar 11, 2014, 3:58 am
Our System is VRV , and the hvac Ashrae forms - part 1 and 2 - does not comply with vrv system - how we could comply with them and many of them does not comply with vrv system ??????????? Last reply: Marcus Sheffer, Mar 13, 2014, 10:29 am |
|
Section 11 or Appendix G?CI-2009 EAp2: Minimum Energy Performanceposted by Steve Gross on Mar 11, 2014, 1:49 pm
Does this credit require the use of Section 11, or can Appendix G be used? I previously asked this about EAc1.3, but this credit does state section 11 in the language. Any input would be... Last reply: Marcus Sheffer, Mar 11, 2014, 2:43 pm |
|
ASHRAE formsCI-2009 EAp2: Minimum Energy Performanceposted by Yaser Al Sharif on Mar 4, 2014, 4:51 am
for commercial interior rating system The LEED template requires to upload interactive forms of ASHRAE. Also, it says it is optional. I would like to know if I need to fill these forms. Last reply: Marcus Sheffer, Mar 6, 2014, 10:07 am |