Forum quick links
Low E Vehicle parking calculation
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Dina Cheyette on
In order to find how many Low E parking stalls we need to provide, we must multiply the number of parking stalls on our site by 5%.
v2009_Minimum Energy Performance Calculator_v6
NC-2009 EAp2:Minimum Energy Performanceposted by Alice chen on
Hi All, I am working on a warehouse project targeting at LEED 2009 certification.
Mosquitos eradicate substance
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Tota Yun on
How I can know if this substance which already used by the contractor in new construction project comply with LEED DELTABAZ 25 EC
Plaza at grade building above.
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Paul Rogers on
I am working on a project where the exterior space consists of an alley way and an outdoor plaza. The outdoor plaza is on columns under the building volume.
Material Calculator
NC-2009 MRc4:Recycled Contentposted by Byrne Lambkin on
I am unable to download the material calculator from the Document Tool Kit
ongoing tracking - recert. guide vs. v06 form
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by Jareb Ketay on
We're at a loss as to what documentation (if any) is required for this credit for a recertification effort, given differences in information between the Recertification guide and the v06 forms. Th
Case study for preliminary analysis
CS-v4 IPc1:Integrative processposted by LEED Pro Consultant on
The credit states to perform a preliminary analysis of energy and water related systems.
Option 2 Air Testing- Measuring VOCs
NC-v4 EQc4:Indoor air quality assessmentposted by Helene Lefkowitz on
While looking into Option 2- Air Testing, a member of our project team presented the following questions as they believe this method is not achievable at this time: 1) Are there currently any labs
Circulating Fans
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, I have some fans In my building which operate to circulate air. They are low speed when occupied and then ramp up to full speed with Temperature goes above 80F.