Topic | Recent |
---|---|
cafeteria as special use space?EBOM-2009 IEQc2.2: Controllability of systems - lightingposted by Pablo Fortunato Suarez on Aug 18, 2010, 3:10 am
Pardon the re-post. This was included in an earlier thread but might have been over-looked: 1) Is it safe to assume that cafeterias fall under "special use spaces"? Special-use spaces... Last reply: Tristan Roberts, Aug 20, 2010, 12:52 am |
|
spaces to considerEBOM-2009 IEQc2.2: Controllability of systems - lightingposted by Oscar Enguita on Jun 2, 2010, 6:36 am
We are trying to certified an offices building from our company. I was considering if I need to take in account all the areas of the buiding. Icluding toilets, corridors, ... or the credit only... Last reply: Tristan Roberts, Jun 2, 2010, 6:42 am |
|
One on/off switch for private officesEBOM-2009 IEQc2.2: Controllability of systems - lightingposted by Rachael McClain on Apr 5, 2010, 12:07 pm
I was reading the requirements above, and it says for for private offices the requirements can be met with only one on/off switch. That doesn't seem very flexible for the occupant. Is this... Last reply: Tristan Roberts, Apr 5, 2010, 1:21 pm |
|
OVER HEAD CEILING LIGHTSEBOM-2009 IEQc2.2: Controllability of systems - lightingposted by RASHID HAMEEN on Mar 16, 2010, 3:33 am
Our factory is equipped with both task lights at the machinery and with overhead ceiling lights. I want to know whether is it necessary to use control switches both to those or will it be... Last reply: Tristan Roberts, Mar 17, 2010, 7:11 pm |