Topic | Recent |
---|---|
Measure AHUs or measure air flow in each room?EBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Michelle Perez on Mar 1, 2011, 1:54 pm
Hello, We are currently working on a LEED... Last reply: Dave Madsen, Dec 2, 2011, 8:10 am |
|
EBOM IEQp1: Dedicated OA to classroom FCU'sEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by James Doyle on Nov 23, 2011, 2:55 pm
For EBOM IEQp1 we... Last reply: Dylan Connelly, Nov 23, 2011, 7:18 pm |
|
System status report for ventilation systemEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Sundararaj Subburaman on Mar 31, 2011, 7:44 am
We are pursuing LEED-EB:O&M for an office building. It has BAS functions for heating, ventilating, and air conditioning system. To comply with the prerequisite requirements, we... Last reply: Alexa Stone, Oct 18, 2011, 1:54 pm |
|
Unable to Meet Pre-req during Current Performance PeriodEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Kristofer Kiszynski on Oct 11, 2011, 10:49 am
I was wondering what would happen if we failed to meet a prerequisite such as IEQp1. Would we need to restart our performance period after correcting whatever it is that needs to be corrected?... Last reply: Ben Stanley, Oct 11, 2011, 12:49 pm |
|
ASHRAE 62.1-2007 in WarehousesEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Prudence Ferreira on Jul 22, 2011, 11:12 am
We are working on a project with very large warehouses with massive roof-mounted air handling units and relatively low occupancy. A 60,000 sf facility may only have 8 workers for example. Do we... Last reply: Julia Weatherby, Aug 24, 2011, 10:10 am |
|
IAQ Procedure as ASHRAE 62.1 Compliance PathEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Laura Case on Jul 26, 2011, 3:20 pm
ASHRAE specifies that the Ventilation Rate Procedure or the... Last reply: David Hubka, Aug 24, 2011, 7:53 am |
|
Problems with version 3 of the Form and VotEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Stephen Redding on Jun 20, 2011, 8:43 pm
RE: IEQp1 Form Table. Case 1: ASHRAE 62.1-2007 Ventilation Rate Procedure (LEED O&M v3) Last reply: David Hubka, Aug 24, 2011, 7:13 am |
|
Use CO2 Measurement to meet Prereq RequirementEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Eric Tu on Mar 29, 2011, 2:55 pm
Hello; Out BAS does not measure air flow (CFM), but, it does measure Return Air and OA C02 values. Can this PreReq be met using... Last reply: David Hubka, Mar 30, 2011, 1:51 pm |
|
Two fan systems on a common supply riserEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Dave Munn on Dec 4, 2009, 2:30 pm
We are working on a building with a supply fan both at the top of a common supply duct riser (penthouse) and another supply fan in the lower level connected to the base of the common riser. Both... Last reply: Jalal Avades, Mar 24, 2011, 1:47 am |
|
Multiple AHUs serving a single spaceEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Zachary Goodnough on Feb 23, 2011, 1:47 am
The building I am working on has a large main sales area which is served by 8 AHUs, all bringing in 100% fresh air. In this case, is the proper protocol to first divide total peak customer and... Last reply: Zachary Goodnough, Mar 23, 2011, 11:07 pm |