Recycled Material (Pre-consumer)

NC-2009 MRc4: Recycled Content
posted by Nick Toon on Aug 11, 2020, 10:00 am

We have a supplier who is claiming that 70% of the the material contained in Iron ductile pipes are pre consumer...

Inclusion of selective Div. 12 products?

NC-2009 MRc4: Recycled Content
posted by Michelle Robinson Schwarting on Sep 23, 2015, 1:31 pm

this is an NCv3 forum, I will focus on V3. Similarly, LI#3005, which addressed MEP work as well as furniture, does not apply to NCv3. When this and several other rulings came down, NCv2 requirements were still...

Last reply: Anya Fiechtl, Jul 1, 2020, 5:06 pm

v2009 recycled content ranges for steel (BOF / EAF)

NC-2009 MRc4: Recycled Content
posted by Lou Niles II on Feb 18, 2020, 2:13 pm

I am curious to revisions and changes that may be present for LEED version 2009 with Steel manufacturers that claim their products are a Mix of BOF and EAF processes. The EAF process yields much...

Last reply: Lou Niles II, Feb 18, 2020, 4:06 pm

Final stage document submission for recycled content

NC-2009 MRc4: Recycled Content
posted by Muhammad SK on Oct 22, 2019, 2:49 am

Hai all,

May I ask some clarification regarding the final document submission regarding...

Last reply: Renee Shirey, Nov 13, 2019, 9:59 am

Calculating total materials cost

NC-2009 MRc4: Recycled Content
posted by Edgar Arevalo on Oct 9, 2019, 1:45 pm

So far, the materials that are included in the speadsheet calculator reflect CSI division 3-10.  And yet we have to account for Divisions 3-10, 31, and 32 when calculating the total materials...

Last reply: Adam Insan, Oct 16, 2019, 1:45 pm

Cullet as recycled material in glass

NC-2009 MRc4: Recycled Content
posted by Mariah Grife on Jan 25, 2013, 12:21 pm

I have worked on LEED v2.1 projects before where...

Last reply: Julie Unitas Giba, Sep 5, 2019, 9:15 am

Excel spreadsheets

NC-2009 MRc4: Recycled Content
posted by Brian Harris on Feb 17, 2015, 11:41 am

is directed to Brian and he may not be monitoring this forum any longer. I am not aware of the B. Inputs worksheet being protected in the BDC MR Calculator. You can add lines at the bottom by clicking the Add...

Last reply: debra a. lombard, Jul 31, 2019, 2:19 pm

MRc4 Required Information

NC-2009 MRc4: Recycled Content
posted by Victoria Rios Esteve on Jul 24, 2019, 2:55 pm

Hi everyone! 

I´m pretty new at LEED certification process, so I will really appreciate your help. 

We are close to upload the construction submittal on a project we have been...

Last reply: Richard Metts, Jul 24, 2019, 3:15 pm

Drainage Concrete Pipes

NC-2009 MRc4: Recycled Content
posted by DEBORAH LOBO on Jul 24, 2019, 8:36 am

Hi all,

I would like to know if Drainage Concrete Pipes fit into the calculation of materials with...

45% of Materials Cost Clarification

NC-2009 MRc4: Recycled Content
posted by William LaRose on Jul 2, 2019, 2:30 pm

I am a new employee to a contractor and have been tasked with handling LEED for a project that is to be finished in a month. The previous group handling LEED did not track the total cost of...

Last reply: Renee Shirey, Jul 2, 2019, 6:45 pm