Log in
Forum » NC-2009 MRc2
Topic

Exemplary Performance- forms question

NC-2009 MRc2: Construction Waste Management
posted by André Knutsson on Sep 19, 2011, 8:09 am

We have finished the project whith a 97.2 % recycling, and are pursuing the one Innovation in Design credit. When we register the IDc1.1 we do not get to choose the MRc2 in the dropdown window...

Last reply: André Knutsson, Sep 28, 2011, 2:40 am

landfill has a recycle/reuses program in place

NC-2009 MRc2: Construction Waste Management
posted by ming zeng on Sep 26, 2011, 5:21 pm

We have a project that the local landfill has a recycle/...

Last reply: Tristan Roberts, Sep 27, 2011, 10:47 am

Pavement and Trees

NC-2009 MRc2: Construction Waste Management
posted by Michelle Teague on Sep 8, 2011, 9:46 pm

The definition of construction and demolition debris on page 362 of the technical guide says "pre-existing structures". I understand the exclusion of land clearing debris, such as soil,...

Last reply: Tristan Roberts, Sep 26, 2011, 10:32 pm

Construction Waste Management || Clean Fill

NC-2009 MRc2: Construction Waste Management
posted by Andrew Gil on Aug 29, 2011, 1:19 pm

Apologies if this topic has already been addressed (and, on that note, I have a suggestion: As the number of postings grows & grows, it might be very helpful to be able to search within a...

Last reply: Susan Walter, Sep 14, 2011, 1:49 pm

Modern methods of construction

NC-2009 MRc2: Construction Waste Management
posted by Bradley Guy on Aug 20, 2011, 5:54 pm

In its current form the MRc2 is for diverting waste that has been created, it does not credit 'preventing' waste, however please take a look at the LEED 2012 2nd public comment version of this...

Last reply: Susan Walter, Aug 29, 2011, 1:46 pm

third-party verification of landfill diversion docs (re-post)

NC-2009 MRc2: Construction Waste Management
posted by Jeff Jones on Jul 12, 2011, 2:30 pm

I am considering submitting a Pilot LEED Credit for verifying (or certifying) the actual recycling of building waste materials, whether it is from construction or an...

Last reply: Bradley Guy, Jul 25, 2011, 7:11 pm

Split Site Recycling

NC-2009 MRc2: Construction Waste Management
posted by Jon Texter on Jun 13, 2011, 12:07 pm

We are working on a 10 building apartment complex, which consists of 9 Residential Buildings and a Community Building. The Community building is attempting LEED NC Silver, but the Residential...

Last reply: RETIRED, Jun 28, 2011, 11:36 am

Tracking / documenting items being reused from demo'd bldg

NC-2009 MRc2: Construction Waste Management
posted by Renee Shirey on May 20, 2011, 11:03 am

On our site we have several items that will be salvaged from our demo'd building/site (furniture, playground equipment) that will be used with the new building/site. How do we track this so we...

Last reply: Valerie Walsh, May 26, 2011, 5:56 pm

Construction Waste Theft!

NC-2009 MRc2: Construction Waste Management
posted by Jeffrey Westall on May 26, 2011, 11:35 am

We are having a serious issue with all of our metal scrap being stollen from the jobsite dumpster. This has impacted our percentage for recycling dramatically. We are currently at only 28%....

Last reply: Renee Shirey, May 26, 2011, 5:31 pm

Trees

NC-2009 MRc2: Construction Waste Management
posted by Norma Lehman on May 9, 2011, 9:03 am

We are removing a lot of trees on our construction site, if we turn it into mulch does this qualify toward our...

Last reply: Valerie Walsh, May 26, 2011, 5:29 pm