Topic | Recent |
---|---|
Baseline in LEED reference guide and IPMVPNC-2009 EAc5: Measurement and Verificationposted by Karoline Geneser on Mar 2, 2012, 1:49 am
Considering EAc5, both LEED Reference Guide and... Last reply: Marcus Sheffer, Mar 2, 2012, 9:11 am |
|
Developing the plan post-constructionNC-2009 EAc5: Measurement and Verificationposted by Maura Adams on Jan 10, 2012, 3:51 pm
Is there any reason that we couldn't develop an M&V plan post-construction, assuming we have the necessary controls in place? Last reply: Marcus Sheffer, Jan 10, 2012, 4:20 pm |
|
Energy Star Portfolio Manager NamingNC-2009 EAc5: Measurement and Verificationposted by April Ambrose on Aug 11, 2011, 4:01 pm
PIf4 says: Note: Project titles in portfolio manager must be the same as the LEED registered project name. Projects must also include their LEED project identification number in the notes portion... Last reply: Marcus Sheffer, Oct 25, 2011, 3:09 pm |
|
Option 3- Whole Building Reporting / Energy Star PMNC-2009 EAc5: Measurement and Verificationposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Oct 25, 2011, 10:58 am
Energy Star Portfolio Manager does not cover all building types. Were a building to not fall into an Energy Star category, is it allowed to simply report the whole building energy and water use... Last reply: Marcus Sheffer, Oct 25, 2011, 11:35 am |
|
M&V plan- Option D vs. Energy StandardNC-2009 EAc5: Measurement and Verificationposted by André Knutsson on Oct 24, 2011, 2:32 am
Our LEED project is situated in Norway. We had to run energy simulations after ASHRAE 90.1-2007 for LEED purposes. However the "real" energy simulations for the building is run after NS3031:2007... Last reply: André Knutsson, Oct 25, 2011, 1:31 am |
|
It doesn't seem like thisNC-2009 EAc5: Measurement and Verificationposted by Maura Adams on Aug 16, 2011, 10:33 am
It doesn't seem like this credit should be so complicated. We have a full DDC system in the new building, which is part of a campus. We already have a Honeywell team on site to monitor other... Last reply: Marcus Sheffer, Sep 19, 2011, 6:15 pm |
|
Highrise condo- What to monitor and meterNC-2009 EAc5: Measurement and Verificationposted by Rob Hink on Sep 8, 2011, 7:57 pm
With a 54 unit highrise condo, what would be acceptable to meter to meet the requirements of the credit. Individual unit electric meters? I can't imagine putting CTs on 130 individual heat pump... Last reply: Marcus Sheffer, Sep 19, 2011, 6:12 pm |
|
Option 3, if no whole bldg. utility meter is installed?NC-2009 EAc5: Measurement and Verificationposted by Sebastian Graba on Aug 4, 2011, 4:38 pm
How can I apply for Option 3, if my project doesn't a whole building utility meter installed? Our LEED building is located on a "campus". So the campus does have a utility meter installed. ...Last reply: David Eldridge, Aug 4, 2011, 6:52 pm |
|
How much flexibilty do you have with what gets sub-metered?NC-2009 EAc5: Measurement and Verificationposted by R. Ted Krasnesky on Jun 16, 2011, 3:46 pm
Say you have a fairly complex project, but the facility engineers only want to sub-meter 7 electrical systems for measurement and verification. The rest of the energy will be monitored through... Last reply: David Eldridge, Jun 16, 2011, 6:13 pm |
|
Option D: Baseline ModelNC-2009 EAc5: Measurement and Verificationposted by Maya Karkour on Dec 16, 2010, 12:23 pm
Hello, I have some questions regarding Option D - Calibrated Simulation: 1) Can we use the ASHRAE 90.1-2007 baseline used in EA cr 1 -Option1 as the M&V baseline ? Last reply: Marcus Sheffer, Apr 6, 2011, 9:07 am |