Submit EAp2 & EAc1 Design Phase, Add Renewable Energy LaterNC-2009 EAc1: Optimize Energy Performanceposted by Ralph Bicknese on Jan 9, 2013, 3:01 pm
Our LEED-Schools 2009 project is close to Preliminary Design Submittal. One issue which is still under consideration is the... Last reply: Ralph Bicknese, Jan 9, 2013, 6:57 pm |
|
Fuel Cell & PV energyNC-2009 EAc1: Optimize Energy Performanceposted by Gaston Viau on Dec 21, 2012, 2:29 pm
Hi, our project is a commercial building which will get 100% of the electricity from PVs (20%) and Gas Fuel Cells (80%). Gas Fuel Cells produce electricity out of Gas, through a clean and... Last reply: Christopher Schaffner, Dec 27, 2012, 2:05 pm |
|
BEMwikiNC-2009 EAc1: Optimize Energy Performanceposted by Eddy Santosa on Dec 15, 2012, 7:27 pm
FYI only, I believe this is useful information for LEEDuser community as well. == Please excuse cross postings == IBPSA-USA would like to announce recent improvements to the... Last reply: Eddy Santosa, Dec 20, 2012, 6:40 pm |
|
Cooling and heating specificationNC-2009 EAc1: Optimize Energy Performanceposted by Jatuwat Varodompun on Dec 19, 2012, 1:00 am
If my project does not have any heating system at all (but it will have cooling system), Are the baseline and proposed models required to have defualt heating system as specified in appendix G?... Last reply: Jatuwat Varodompun, Dec 20, 2012, 10:03 am |
|
Evaporative Coolers and ASHRAE Mandatory Requirements 6.4.3.4NC-2009 EAc1: Optimize Energy Performanceposted by Jorge Torres-Coto on Dec 18, 2012, 5:31 pm
If I have a space (manufacturing warehouse) that is served by Evaporative Coolers only. Do the Mandatory Requirements of ASHRAE 90.1 section 6.4.3.4.2 & 6.4.3.4.3 apply? Last reply: Jorge Torres-Coto, Dec 19, 2012, 6:08 pm |
|
Space ClassificationNC-2009 EAc1: Optimize Energy Performanceposted by Blas Beristain on Dec 17, 2012, 5:50 am
Hellow Everyone, 1) In the case of a technical space (equipment room) that is a Conditioned Space as per ASHRAE 90.1 and, therefore, must be simulated as a heated/cooled reference office... Last reply: Marcus Sheffer, Dec 17, 2012, 3:26 pm |
|
Multiple building- Energy Modeling2NC-2009 EAc1: Optimize Energy Performanceposted by Marina Andrade on Dec 11, 2012, 8:59 am
Hi, I'm working in another project that is attempting multiple building certification. Some of the buildings are connected by walkways and vertical circulation, i.e., there is only one... Last reply: Marina Andrade, Dec 17, 2012, 11:42 am |
|
ASHRAE 90.1 appendix G- VAV modelisation in baseline system 7NC-2009 EAc1: Optimize Energy Performanceposted by Julien Daclin on Dec 11, 2012, 12:30 pm
Hi, Last reply: Marcus Sheffer, Dec 12, 2012, 10:36 am |
|
Process energyNC-2009 EAc1: Optimize Energy Performanceposted by Jatuwat Varodompun on Dec 8, 2012, 10:10 pm
I got the reviewed comment on the... Last reply: Jatuwat Varodompun, Dec 11, 2012, 11:02 am |
|
Existing building, two parts, only one certifiedNC-2009 EAc1: Optimize Energy Performanceposted by Francesco Passerini on Dec 4, 2012, 6:40 am
I am going to model an existing building that is being altered. The situation is as follows: Last reply: Scott Bowman, Dec 10, 2012, 11:29 am |