Submit EAp2 & EAc1 Design Phase, Add Renewable Energy Later

NC-2009 EAc1: Optimize Energy Performance
posted by Ralph Bicknese on Jan 9, 2013, 3:01 pm

Our LEED-Schools 2009 project is close to Preliminary Design Submittal. One issue which is still under consideration is the...

Last reply: Ralph Bicknese, Jan 9, 2013, 6:57 pm

Fuel Cell & PV energy

NC-2009 EAc1: Optimize Energy Performance
posted by Gaston Viau on Dec 21, 2012, 2:29 pm

Hi, our project is a commercial building which will get 100% of the electricity from PVs (20%) and Gas Fuel Cells (80%).

Gas Fuel Cells produce electricity out of Gas, through a clean and...

Last reply: Christopher Schaffner, Dec 27, 2012, 2:05 pm

BEMwiki

NC-2009 EAc1: Optimize Energy Performance
posted by Eddy Santosa on Dec 15, 2012, 7:27 pm

FYI only, I believe this is useful information for LEEDuser community as well.

== Please excuse cross postings ==

IBPSA-USA would like to announce recent improvements to the...

Last reply: Eddy Santosa, Dec 20, 2012, 6:40 pm

Cooling and heating specification

NC-2009 EAc1: Optimize Energy Performance
posted by Jatuwat Varodompun on Dec 19, 2012, 1:00 am

If my project does not have any heating system at all (but it will have cooling system), Are the baseline and proposed models required to have defualt heating system as specified in appendix G?...

Last reply: Jatuwat Varodompun, Dec 20, 2012, 10:03 am

Evaporative Coolers and ASHRAE Mandatory Requirements 6.4.3.4

NC-2009 EAc1: Optimize Energy Performance
posted by Jorge Torres-Coto on Dec 18, 2012, 5:31 pm

If I have a space (manufacturing warehouse) that is served by Evaporative Coolers only. Do the Mandatory Requirements of ASHRAE 90.1 section 6.4.3.4.2 & 6.4.3.4.3 apply?

Last reply: Jorge Torres-Coto, Dec 19, 2012, 6:08 pm

Space Classification

NC-2009 EAc1: Optimize Energy Performance
posted by Blas Beristain on Dec 17, 2012, 5:50 am

Hellow Everyone,

1) In the case of a technical space (equipment room) that is a Conditioned Space as per ASHRAE 90.1 and, therefore, must be simulated as a heated/cooled reference office...

Last reply: Marcus Sheffer, Dec 17, 2012, 3:26 pm

Multiple building- Energy Modeling2

NC-2009 EAc1: Optimize Energy Performance
posted by Marina Andrade on Dec 11, 2012, 8:59 am

Hi,

I'm working in another project that is attempting multiple building certification. Some of the buildings are connected by walkways and vertical circulation, i.e., there is only one...

Last reply: Marina Andrade, Dec 17, 2012, 11:42 am

ASHRAE 90.1 appendix G- VAV modelisation in baseline system 7

NC-2009 EAc1: Optimize Energy Performance
posted by Julien Daclin on Dec 11, 2012, 12:30 pm

Hi,
I have a question about the interpretation of section G3.1.3.13 (...

Last reply: Marcus Sheffer, Dec 12, 2012, 10:36 am

Process energy

NC-2009 EAc1: Optimize Energy Performance
posted by Jatuwat Varodompun on Dec 8, 2012, 10:10 pm

I got the reviewed comment on the...

Last reply: Jatuwat Varodompun, Dec 11, 2012, 11:02 am

Existing building, two parts, only one certified

NC-2009 EAc1: Optimize Energy Performance
posted by Francesco Passerini on Dec 4, 2012, 6:40 am

I am going to model an existing building that is being altered. The situation is as follows:
A. The building is divided in two parts, one (offices) is going to be certificated LEED, the...

Last reply: Scott Bowman, Dec 10, 2012, 11:29 am