Instantenous electric water heatersNC-2009 EAp2: Minimum Energy Performanceposted by Adam Rustige on Jun 28, 2013, 9:07 am
Hello, Last reply: Marcus Sheffer, Jun 28, 2013, 10:17 am |
|
Existing Envelop is unknowNC-2009 EAp2: Minimum Energy Performanceposted by Anil Bhari on Jun 26, 2013, 11:20 am
As per requirement G3.1.5(f) baseline, any existing envelope, the baseline building design shall reflect existing conditions prior to any revision. Last reply: Anil Bhari, Jun 27, 2013, 3:54 pm |
|
Energy modeling review questionNC-2009 EAp2: Minimum Energy Performanceposted by Santiago Rodriguez on Jun 26, 2013, 2:21 pm
For a LEED project that recently received the preliminary design review comments, we were asked to analyze and correct the documentation to comply with pre-requisite EAp2. The problem... Last reply: Marcus Sheffer, Jun 26, 2013, 7:20 pm |
|
ASHRAE Advanced Energy Design Guide- Mixed office/warehouse bldNC-2009 EAp2: Minimum Energy Performanceposted by Michael Smithing on Jun 24, 2013, 7:29 am
We're looking at a building that will have approximately 10,000 sqft. of office space and 10,000 sqft. of warehouse space. Can this building pursue Option 2 and follow the Advanced Energy Design... Last reply: Marcus Sheffer, Jun 24, 2013, 10:22 am |
|
ASHRAE Mandatory provisions 10.4NC-2009 EAp2: Minimum Energy Performanceposted by Elena Grau on Jun 13, 2013, 4:22 am
Hello, Last reply: OSCAR DE LA RED, Jun 17, 2013, 4:00 am |
|
Light SchedulingNC-2009 EAp2: Minimum Energy Performanceposted by Jean Marais on Jun 14, 2013, 6:23 am
1) Assume the same scheduling is used in both design and baseline case, may I schedule lights to be off during occupied hours in a zone (both baseline and design models)? Last reply: Jean Marais, Jun 14, 2013, 4:08 pm |
|
Baseline system types and building areaNC-2009 EAp2: Minimum Energy Performanceposted by Jatuwat Varodompun on Jun 13, 2013, 1:42 am
We have the project of to 250,000 sq ft. The Air conditioned area is only 50,000 sq.ft. The rest is enclosed unconditioned area (No HVAC) of 200,000 sq.ft. What area should we use to determined... Last reply: Marcus Sheffer, Jun 14, 2013, 10:23 am |
|
Exceptional CalculationsNC-2009 EAp2: Minimum Energy Performanceposted by Stephen DeGrazio on Jun 11, 2013, 3:10 pm
I have a new bubilding which will be mostly a performing arts theater and school gymnasium. Because these two spaces make up well over half of the building, my annual proccess energy costs are... Last reply: Amy Boyce, Jun 12, 2013, 1:57 pm |
|
Central Plant providing energy to more than one buildingsNC-2009 EAp2: Minimum Energy Performanceposted by Therese Malm on Jun 4, 2013, 12:52 pm
Hi, We have a project where the Central Plant, consisting of a geothermal heat exchanger, is considered to provide energy to more buildings than the building seeking LEED certification.... Last reply: Marcus Sheffer, Jun 6, 2013, 11:41 am |
|
Ventilation requirements for naturally ventilated spacesNC-2009 EAp2: Minimum Energy Performanceposted by Jean Marais on May 29, 2013, 4:26 am
A difficalt case: Radiant floor + Nat Vent Last reply: Jean Marais, Jun 4, 2013, 10:30 am |