Side Lighting- ClerestoryNC-2009 EAp2: Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on Jul 12, 2019, 8:58 am
Hello everyone, happy Friday! Should a Clerestory Side-light be considered a window? Not sure why am thinking it could be considered as a Skylight but thought to confirm anyway. Thank you... Last reply: Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C, Jul 12, 2019, 2:06 pm |
|
Exhaust not interlocked with HVACNC-2009 EAp2: Minimum Energy Performanceposted by Jorge Lopez de Obeso on Nov 14, 2018, 11:38 am
Hello, we have this residential project were the HVAC system is as follows: Baseline: System 2 - PTHP Proposed: Mini Split System The thing here is that, as known,... Last reply: deuisi cromversa, Jul 10, 2019, 4:43 pm |
|
EnergyPlus building geometry ErrorsNC-2009 EAp2: Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on Jul 5, 2019, 1:35 pmMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up July 8, 2019- 2:57 pm These forums are generally no the best for getting answers related to specific software issues. I would try the EnergyPlus help desk or maybe the forums on this page- http://energy-models.com/ Log in or register to post comments Cory Duggin Senior Energy Wizard TLC Engineering Solutions LEEDuser Premium Member 53 thumbs up July 8, 2019- 4:26 pm https://unmethours.com/questions/ has a lot of EnergyPlus users answering questions too. Log in or register to post comments Fatou Jabbie,... Last reply: Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C, Jul 9, 2019, 10:00 am |
|
ENERGY STAR certified washer/dryer combos?NC-2009 EAp2: Minimum Energy Performanceposted by Danielle Waters on Jul 8, 2019, 3:00 pm
If ENERGY STAR does not have a certification for dryers or washer/dryer combos, are combos excluded from the prerequisite? Last reply: Waleed AlGhamdi, Jul 8, 2019, 3:44 pm |
|
Minimum Energy Performance Calculator – Performance Outputs tabNC-2009 EAp2: Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on Jul 5, 2019, 2:00 pmAlGhamdi Sustainability Enabler Eskew+Dumez+Ripple LEEDuser Basic Member 20 thumbs up July 8, 2019- 2:48 pm Sorry, I should have seen in which forum this was posted:) Log in or register to post comments ... Last reply: Waleed AlGhamdi, Jul 8, 2019, 2:48 pm |
|
Modeling Electric HeatersNC-2009 EAp2: Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on Jun 26, 2019, 1:27 pm
Hi, I'd like advice on the best approach to model Electric Heaters for stairways, vestibules, gas and water meter room. We two types of e-heaters 1) with a built in single pole... Last reply: Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C, Jun 27, 2019, 12:46 pm |
|
Minimum Energy Performance Calculator – Performance Outputs tabNC-2009 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Jun 17, 2019, 9:09 am
Greetings, In the project we are modeling, there are On-site... Last reply: Jean Marais, Jun 19, 2019, 3:52 am |
|
Selecting the HVAC systemNC-2009 EAp2: Minimum Energy Performanceposted by Madushan Samarakoon on May 15, 2019, 6:29 am
Hi there, I am working in a LEED project of a 12-story (2 are below ground car parks) City Hotel project with approx. 12000 sqft per floor. I have selected Baseline HVAC system as... Last reply: Madushan Samarakoon , May 15, 2019, 11:26 pm |
|
Building Area Method and System designationNC-2009 EAp2: Minimum Energy Performanceposted by Jorge Lopez de Obeso on Mar 15, 2019, 1:30 pm
Hello everyone, I have a project with the following conditioned area categorization. 1st to 5h Floor are composed by: Assembly areas: 59,232 sq ft (considering hotel service areas... Last reply: Jorge Lopez de Obeso, Mar 19, 2019, 3:20 pm |
|
Building Area Method and System designationNC-2009 EAp2: Minimum Energy Performanceposted by Jorge Lopez de Obeso on Mar 15, 2019, 3:51 pm
Hello everyone, I have a project with the following conditioned area categorization. 1st to 5h Floor are composed by: Assembly areas: 59,232 sq ft (considering hotel service areas... |