Topic | Recent |
---|---|
Existing envelopeNC-2009 EAp2: Minimum Energy Performanceposted by Sandra Holmström on May 13, 2015, 4:49 am
We have a project that is a major renovation of an existing building. We are planning on using the Existing envelope pathway - and thereby keeping the existing envelope in both the Proposed and... Last reply: Marcus Sheffer, May 13, 2015, 9:23 am |
|
Off-hours control, zone isolationNC-2009 EAp2: Minimum Energy Performanceposted by Ricardo Sá on May 12, 2015, 6:45 am
According to ASHRAE 90.1 (section 6.4.3.3.4), all HVAC systems serving zones that are intended to operate or be occupied non simultaneously, shall be divided into isolation areas and equipped... Last reply: Marcus Sheffer, May 12, 2015, 11:21 am |
|
Off-hours control, automatic shutdownNC-2009 EAp2: Minimum Energy Performanceposted by Ricardo Sá on May 12, 2015, 6:46 am
According to ASHRAE 90.1 (section 6.4.3.3.1), all HVAC systems shall be equipped with a control systems that turns the HVAC off on a time basis (timeclock control) or when the spaces are not in... Last reply: Marcus Sheffer, May 12, 2015, 11:19 am |
|
virtual rateNC-2009 EAp2: Minimum Energy Performanceposted by Razan Nejem on May 12, 2015, 4:51 am
our project has a district heating with a flat rate of 0.012$/kw Last reply: Marcus Sheffer, May 12, 2015, 9:29 am |
|
Fuel types of process energyNC-2009 EAp2: Minimum Energy Performanceposted by Jatuwat Varodompun on May 8, 2015, 11:38 am
We have a new plant using NGV as a fuel to fry potato chip in Thailand. The exact similar technology was used in another plant in China (same potato chip brand) which is already LEED gold... Last reply: Jatuwat Varodompun, May 8, 2015, 9:23 pm |
|
Work spaces within entrance vestibuleNC-2009 EAp2: Minimum Energy Performanceposted by CT G on May 7, 2015, 11:35 am
We are working on a project with two main entrances. Both include vestibules. Within one of the entrance vestibules, the owner needs to include a couple work spaces: a security desk, a cashier´s... Last reply: CT G, May 7, 2015, 2:07 pm |
|
Equipment Capacities for only one building pursue LEEDNC-2009 EAp2: Minimum Energy Performanceposted by Indochine Engineering VN on Apr 24, 2015, 5:36 am
Hi, I have a District energy system (chillers, boilers, cooling towers, pumps) serves 3 buildings but only 1 pursues LEED, so my project doesn't use total capacities of those equipments. My... Last reply: Lawrence Lile, May 7, 2015, 12:15 pm |
|
HVAC systems and equipment efficiencyNC-2009 EAp2: Minimum Energy Performanceposted by Guillermo T. Adamo on May 4, 2011, 5:43 pmthumbs up May 10, 2011- 7:49 pm Dear Marcus, I read the discussion forum that you recommended, and still dont quite understand. The product we are using figures in the link below:... Last reply: CT G, May 5, 2015, 1:35 pm |
|
Drain Water Heat Recovery SystemNC-2009 EAp2: Minimum Energy Performanceposted by Luis Barros on Apr 30, 2015, 4:03 pm
A client wants to utilize our Zypho Drain Water Heat recovery system for a hospitality project. The client wants to confirm the availability of LEED credits. My understanding is that while the... Last reply: Jean Marais, May 4, 2015, 9:41 am |
|
Window to Wall ratio uniform?NC-2009 EAp2: Minimum Energy Performanceposted by Haojie Wang on Apr 29, 2015, 12:01 pm
I recently noticed LEED Reference Guide for EAc1 Example Option 1 (p278) says we need to redistribute the window to wall ratio uniformally on each orientation of the building. However, before I... Last reply: Marcus Sheffer, Apr 29, 2015, 12:10 pm |