spaces,zones and systems in the energy modelNC-2009 EAp2: Minimum Energy Performanceposted by Tarek Dalati on Jun 4, 2012, 11:49 am
do the spaces,zones and air systems in the baseline should have the same names as in the proposed design and the ones in the upploaded drawings? Last reply: Marcus Sheffer, Jun 4, 2012, 1:01 pm |
|
electrical room/swimming pools coolingNC-2009 EAp2: Minimum Energy Performanceposted by Tarek Dalati on Jun 4, 2012, 2:15 am
is the electrical rooms and internal swimming pools cooling is considered as a process load or not? regards Last reply: Erin Adkins, Jun 4, 2012, 10:51 am |
|
Comnet automated template completionNC-2009 EAp2: Minimum Energy Performanceposted by Erin Adkins on Jun 1, 2012, 10:33 am
Has anybody here used the Comnet.org portal to automatically complete your EAp2 and EAc1 templates using the Comnet XML export from your Trace 700 model or Equest sim files? Did it work well for... |
|
ASHRAE 90.1, table 6.8.1 and projects outside of USANC-2009 EAp2: Minimum Energy Performanceposted by Richard Land on May 25, 2012, 5:48 am
Hello, I have been asked to help a manufacturer who wants to provide equipment for a LEED project in Europe. It is an airhandling units with packaged heat pump. At the moment they do not... Last reply: Jean Marais, May 30, 2012, 11:37 am |
|
EnergyPro printout vs EAp2-Section 1.4 TablesNC-2009 EAp2: Minimum Energy Performanceposted by Robert Robison on May 25, 2012, 10:33 am
Is it really necessary to fill out the EAp2-Section 1.4 Tables spreadsheet when it looks to me like EnergyPro provides all the same data in the exact same format? Couldn't I just upload the... Last reply: Marcus Sheffer, May 25, 2012, 11:17 am |
|
Space Heating in Table EAp2-5NC-2009 EAp2: Minimum Energy Performanceposted by Robert Robison on May 23, 2012, 1:49 pm
We have a building that is using both natural gas and electricity for heating. Table EAp2-5 only seems to give me the option for one type of space heating energy source. Does anyone have... Last reply: Marcus Sheffer, May 23, 2012, 2:38 pm |
|
Exceptional Calculation Methods for Non-US projectsNC-2009 EAp2: Minimum Energy Performanceposted by Susann Geithner on Dec 7, 2010, 5:44 pm
We have submitted projects with exceptional calculation methods like demand controlled ventilation in a garage or motion sensored garage lighting. We have been asked to prove that these... Last reply: Marcus Sheffer, May 23, 2012, 9:59 am |
|
FloodlightNC-2009 EAp2: Minimum Energy Performanceposted by Ameet AA on May 18, 2012, 12:03 pm
2. Lighting requirement from ASHRAE 90.1-2007 Appendix G? ASHRAE 90.1 Appendix G TABLE 9.4.5 identifies limiting lighting power... Last reply: Marcus Sheffer, May 18, 2012, 12:57 pm |
|
Baseline for Data Center BuildingNC-2009 EAp2: Minimum Energy Performanceposted by Diego Escalona on May 17, 2012, 12:50 pm
Hello. The situation is that we formulate a baseline to simulate according to Standard 90.1-2007 Appendix G, as the building is applying for LEED certification. Then we intend to validate... Last reply: Diego Escalona, May 18, 2012, 11:49 am |
|
Chilled Water Pumps, Primary/SecondaryNC-2009 EAp2: Minimum Energy Performanceposted by Aaron Dahlstrom on May 18, 2012, 11:28 am
ASHRAE 90.1-2007 Sec G3.1.3.10 requests that users specify pump power of 22 W/gpm, with a primary / secondary pumping system and variable flow on the secondary side. In my particular design, the... Last reply: Marcus Sheffer, May 18, 2012, 11:43 am |