Forum quick links
Take back program language for contract
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Brightworks Sustainability on
Does anyone have a sample contract with a manufacturer for a take back program? My project teams are asking about this and we are not sure who the responsibility falls on - owner? GC?
Using carbon credits for scope 2
Retail-CI-v4 EAc6:Green power and carbon offsetsposted by Raissa Petri on
Hello,
How should I convert energy consumption into carbon credits in Brazil? I used GHG Protocol tool, which is the most recognized one in the country. Is that acceptable?
Dedicated Central OA Unit
CI-v4 EQp1:Minimum indoor air quality performanceposted by Jalal Avades on
Our project is a Commercial Interior in two floors of an existing tower. The floors are served by 4-pipe fan coils.
Exemplary Performance
CS-v4 SSc5:Heat island reductionposted by Emmanuel Pauwels on
The Reference Guide states as requirement for Exemplary Performance: Achieve both Options 1 and 2. Locate 100% of parking under cover.
Light Reflectance values
CI-v4 EQc6:Interior lightingposted by Karen Elliott on
How do you calculate the light refectance value of a glass partition?
Assigning two ac systems to a single zone
NC-2009 EAp2:Minimum Energy Performanceposted by Madushan Samarakoon on
I am working with shopping mall project. each shop has equipped with FCU units for air conditioning while separate treated fresh air AHU (PAHU) is supplying fresh air to each shop.
ERV and multiple fan coil units
NC-2009 IEQp1:Minimum IAQ Performanceposted by Courtney Royal on
Hello, I've only completed the ventilation spreadsheet a few times and have a few questions. Thanks!
Should we always display the Best Practice number?
posted by Andrea Lemon on
Should the Best Practice names always be accompanied by their number? See the attached screenshots, all taken from the main forum page:
Forums not relating to a specific Best Practice
posted by Andrea Lemon on
What general forums do you want (in addition to the Best Practice forums)? On LEEDuser we have "Forum quick links" in the left sidebar that cover general topics:
Best Practice checklist project phases
posted by Andrea Lemon on
On LEEDuser we divide checklists into multiple project phases. Specifically: