Forum quick links
Additional scope to test...what if there is no contamination found?
NC-v4 LTc3:High priority siteposted by emily reese moody on
We have a project that is not required to do site contamination testing, and does not believe there is any reason for the site to have contamination (they have always owned the site), so they did n
UPLOAD button not available?
posted by Jenni Betancourt on
We are at the stage where we are responding to the GBCI Reviewer's comments on the Design/Construction Submittal.
Outdoor Ice Rink Energy Performance
NC-v4 EAp2:Minimum energy performanceposted by Ralph Bicknese on
We are looking at LEED for a multi-purpose sports facility with indoor space and an outdoor ice rink that is not enclosed.
Group or single project for Warehouse
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Sofia Barahona on
We are currently working on a warehouse which has a total of 12,704.13m2, the project consist of a building of storage and operative offices with a total of 12,516.67m2 and a small separate spaces
62 2010 MZ Calc excel for LEED v 4.
CI-v4 EQp1:Minimum indoor air quality performanceposted by Sadaf Alam on
Hi ,
Does anyone have 62 2010 MZ Calc excel for LEED v 4.
Acoustic Performance
NC-v4.1 EQc9:Acoustic Performanceposted by Kyle Roth on
Is this credit to require all of the structure (walls, floor, floor slab, roof ect.) to be accounted for in measuring for this credit? Or just the walls?
SCL Carbon Group -- Notes from 2/26/20 Mtg; Links for Doodle Poll for Next Mtg; Link to Shared Google Drive
posted by Dave Walsh on
Hi All,
Attached are the meeting notes from the Carbon Group's 2/26/20 -- also in the PDF are the slides presented in the 2/26 meeting.
Track light power consumption
Retail-CI-v4 EAp2:Minimum energy performanceposted by Mahesh Shankar on
This one is a retail project in Thailand. The store has many tracklights due to which we are not able to get the required power savings in lighting.
Sunset date and timelines
posted by suveera kakkar on
Hello