Forum quick links
Measurements for CO2 / TVOC
Hospitality-EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Denaye Hinds on
Where should these measurements be taken throughout the property/building and how many per zone are required?
TRACE 700 Performance Report - Optimal
NC-v4 EAp2:Minimum energy performanceposted by Mark Norris on
Good Afternoon,
Occupancy date for Core and Shell
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Edgar Arevalo on
Regarding the MERV-8 filter section of this credit, which is for a C&S project, no tenant occupancy dates have been established. Should I just wait til we get the first tenant occupancy d
Option 1 Noncompliant Lights are Being Phased Out
EBOM-v4 SSc4:Light pollution reductionposted by Justin Schwartz on
Good afternoon everyone,
LTc7 - Reduce parking footprint - examplary performance
NC-v4 LTc7:Reduced parking footprintposted by Maria Peralta on
Hello!
Ventilation Requirement for High Rise Residential
NC-v4 EQp1:Minimum indoor air quality performanceposted by Jay Murray on
Question: Is it necesary to hard duct ventilation air into each bedroom within the apartment?
Existing building LEED BD+C og LEED O+M
posted by Piotr Podhajny on
I am trying to guide a client for LEED certification. It is for a work-clothes factory with administration, showroom, storage facility etc.
Interior Partitions Option 2: Strategy F without movable partitions?
NC-v4 EQc6:Interior lightingposted by Cindy Quinn on
Has anyone had success earning Interior Lighting Option 2: Strategy F with a project that doesn't have movable partitions? Our project was denied this strategy because we don't have movable p