Forum quick links
Thermal Comfort Survey
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Leed User on
I used the survey template provided on this site and was denied the credit saying it did not address all of the ASHRAE 55-2004 environmental variables (air speed, humidity, radiant temperature, and
Lease Agreement an option to comply with the credit requirements
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Katherine Ann Resurreccion on
Hi, We are currently documenting the requirements for this credit and our option in order to comply is to provide a Tenant/Lease Agreement.
Process loads
NC-v4 EAc2:Optimize energy performanceposted by Ake Larsson on
In our company, we have introduced LEED as mandatory for all new construction projects.
How long do you have to do surveys?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Parker williams on
How long do you have to do surveys? Is this suppose to be ongoing forever?
EAp2-4: Energy Star equipment: conversion from kWa to Watts
CI-2009 EAp2:Minimum Energy Performanceposted by Sarah Simchuk on
I'm attempting to register the energy star equipment for my project under Table EAp2-4. The table asks for Rated Power in WATTS.
Rated power
CI-2009 EAp2:Minimum Energy Performanceposted by Yaser Al Sharif on
From where can i take rated power for equipments like laptop , i read it on laptop about 55wh then i divded it by work hours give me 6.7watt , is that right ??????
M&V approach case 2 (75% or more of total building area)
CI-2009 EAc3:Measurement and Verificationposted by Gaston Michaud on
We were trying to pursue this credit by developing and implementing a M&V plan following option C from the IPMVP, but after reading some comments, it seems that this path was removed.
Clarification
CI-2009 EAc3:Measurement and Verificationposted by Redy Truccolo on
Hi Marcus, We've a LEED CS certified building in which the Tenant will occupy almost 100% of the total area, so we will fall in CASE 2. We obtained the CS certification EAc5.2 credit and we've sub
ITE Versioning Issues
posted by Alfred Miller on
Any update by USGBC on the versioning issues of the ITE Parking Generation Study?