How long do you have to do surveys? Is this suppose to be ongoing forever?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium forForum discussion
NC-2009 IEQc7.2: Thermal Comfort—Verification
How long do you have to do surveys? Is this suppose to be ongoing forever?
LEEDuser is supported by our premium members, not by advertisers.
Go premium forTo post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.
Susan Walter
HDRLEEDuser Expert
1296 thumbs up
August 7, 2014 - 3:12 pm
You have to do one between 6 and 18 months after occupancy per the credit language. If projects are doing Enhanced Commissioning, most teams align this survey with that credit work as the survey can inform the commissioning.
Kathryn West
LEED AP BD+C, O+M, Green Globes ProfessionalJLL
154 thumbs up
August 7, 2014 - 3:15 pm
The form now says you have to confirm there is a "permanent" monitoring system. Based on feedback in this forum and from leedinfo@usgbc.org I understand that the surveys now have to be done on a "regular, ongoing basis" which I interpret to be every 6-12 months.
Cam Fitzgerald
Energy Engineer7group
25 thumbs up
August 8, 2014 - 8:10 am
In the reference guide this is an additional credit requirement for LEED-NC projects only and the "permanent" monitoring system referenced on the form is to monitor the building performance (e.g. actual space temperature and relative humidity). This requirement ensures that the building has the necessary tools to help identify the source of occupant discomfort.
Kathryn West
LEED AP BD+C, O+M, Green Globes ProfessionalJLL
154 thumbs up
May 20, 2015 - 5:45 pm
I got an email from GBCI confirming that regular, repeated surveys count as permanent monitoring.