Forum quick links
Credit compliance types (cost vs surface area) and SIPs
NC-v4.1 EQc2:Low-Emitting Materialsposted by Chloe Naese on
Hi everyone,
Regional Material - No Other Leadership Extraction Practice Applicable
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Brianne Grace on
I have a project where we have Pre-Cast Concrete Panels valued at close to $5Million. The components of the panels (Cement, Sand, Aggregate, Fly-Ash) are all sourced within 100 miles of the p
Exam Scheduling
posted by Patty Lloyd on
I have a number of staff having trouble navigating GBCI/Prometic software to get scheduled for exams. When I hit the register button on the LEED GA USGBC website I am getting a 502 bad gatewa
Definition of "Vegetated planters"
NC-v4 SSc5:Heat island reductionposted by Marion THIBAULT on
Dear all leed users,
ISO 140001 Certification
NC-2009 IDc1:Innovation in Designposted by kathy zarsky on
Has anyone had any success in receiving an innovation credit point for this with LEED version 2009?
Your Response Requested: Please Complete the Pre Summit-Palooza Survey!
posted by RoseAnn Grimes on
Hello Green Gurus,
Strucure and Enclosure Materials may not constitute more than 30% of the compliant building products
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Dave Hubka on
Reference Guide correction 100002183 allows this 30% to be adjusted based on the percent value of structure/enclosure materials compared to total material costs. Actual cost must be used.
Modelling free cooling
CS-2009 EAc1:Optimize Energy Performanceposted by Ilaria Piong on
I have a Core and Shell building where there is an air-to-air heat pump.
Passive House Certification
NC-v4 EAp2:Minimum energy performanceposted by Matthew Kaplan on
We have a school project that is considering both PHIUS certification and LEED certification.
Construction Waste and Surplus Survey
posted by Patty Lloyd on
Hi, the SF Dept of Environment is doing some surplus construction materials studies there are surveys for designers and contractors. They are looking for a wide array of responses, so don't w