Forum quick links
Operable windows to avoid mechanical ventilation
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Harry Flamm on
The home page for this credit, by Ben Stanley, stated below, mentions an alternative reqmn't allowing for operable windows. Can someone elaborate on this for me?
Subfloor vs underlayment - uncoupling waterproofing membrane for ceramic floors
NC-v4.1 EQc2:Low-Emitting Materialsposted by Priscillia Champagne on
Hi! We will be installing a polyethylene based, uncoupling and waterproofing membrane (Schluter-DITRA) on top of our concrete floor before installing the ceramic tiles.
Open Space based on Campus owned by third parties. Can we claim this credit as a Campus Credit approach
NC-v4.1 SSc3:Open Spaceposted by Sadaf Alam on
Hi all,
what are the rules around the ownership of the open space if we want to document as a “ Campus” credits approach.
Water Bottle Filling Stations - Do Green Tickers count as a sub-meter?
NC-v4 WEc4:Water meteringposted by Shana Scheiber on
Has anyone attempted to claim the bottle green ticker feature on water bottle filling stations as a sub-meter for the purposes of the water metering credit under the process water category?
Storage and Collection of organic Waste
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Cecile de Villemeur on
Hello, could you confirm that I should have an area to storage organic Waste, when the City offers the service ?
Designed for Circularity
Pilot-Credits MRpc131:Circular Productsposted by Kathy Trejo on
Need some help understanding what to look for/where to find it:
How to Submit a LEED Interpretation
posted by Sarah Gudeman on
I'm teaching a LEED GA study group and was rambling on the differences between CIR and precident-setting LEED Interpretation (that gets posted in the addenda
Tackboards and markerboards
NC-v4.1 EQc2:Low-Emitting Materialsposted by Cindy Quinn on
Which category do tackboards and markerboards need to comply with - wall panels or composite wood? Or both? Is there a certification that meets both?
TIA
Resuming construction after 14 years under a new ownership.
posted by Esteban Velez on
Hello Everyone!! I'm new with LEED and need your help to get this started: The building construction started but the owner went bankrupt in 2008.
Retail Fit-Up - BD+C Retail or ID+C; v4 or v4.1??
posted by Michelle Smith on
Hello all,