EBOM-v4 EQc7:Green cleaning - products and materialsposted by JLL Sustainability Consulting on
I am working on projects in South and Central America, Middle East and the United Kingdom.
gross/net floor area for flush-out calculations
NC-v4 EQc4:Indoor air quality assessmentposted by Agnieszka Rylska on
I would like to confirm if flush-out calculations should be based on gross or net floor area of the building.
Can client provide testing of a product to show compliance?
NC-v4 EQc2:Low emitting materialsposted by emily reese moody on
My client is a university that asked if they could provide the testing required for products if it's not available from the manufacturers.
Spaces that are not in scope
NC-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
I am currently working on an energy model for a major renovation project under LEED BD+C. There are two major spaces (both lunch rooms) that are not going to be served by the new HVAC sy
lengths of the permanent entryway systems
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ydo Schuuring on
LEED v4 describes to install a permanent entryway systems at least 10 feet (3 meters) long in the primary direction of travel, to capture dirt and particulates entering the building at regularly us
Baseline Heat Rejection System 7
CS-v4 EAc2:Optimize energy performanceposted by Ciaran McCabe on
Hi I am using Baseline system 7 and I notice that the heat rejection energy is higher than expected.
Ongoing commissioning work only focus on ECMs of energy audit?
EBOM-v4 EAc3:Ongoing commissioningposted by JAMES CHEN on
Guide mentioned ongoing commissioning builds on energy analyses and implementation of energy conservation measures (ECMs).
Architect 50
posted by Kate Bubriski on
I see that the Architect 50 questions this year are organized around AIA 2030 Commitment reporting. I have a question about how people are answering them.