PI Form 2 Estimated project budget
NC-2009 PIf2:Project Summary Detailsposted by Brian Durgin on
Our project consist of multiple buildings on a large site, well our LEED Boundary only includes the main building and surrounding site area.
Ozone treatment
NC-v4 EQp1:Minimum indoor air quality performanceposted by Gabriela Crespo on
Dear all, We are working on a project where the ozone levels exceed the most recent three year average, so we must include air-cleaning devices for ozone.
Factory-Existing Building
EBOM-v4 EAp2:Minimum energy performanceposted by VISHESH AGARWAL on
I am working on the factory existing building project. the machine load is about 3000 kw.
Biorenewable paint
posted by Eric Linak on
Are there plans to give high credits to paints or adhesives that contain biorenewable content?
Clarify the requirement for offsite coatings (and/or coating that will be covered)
NC-v4 EQc2:Low emitting materialsposted by Summer Gorder on
The team as me to clarify the definition of Primers, Sealers, and Undercoaters in the LEED description? Does that include any coating that gets covered with an addi
Green roof grants and funding
posted by Maria Papiez on
Hello, All! I'm hoping for your help to keep a green roof on a project of ours. We have a large healthcare project in the Midwest that is coming in over budget. To avoid losing ou
Project in Europe
NC-v4 EQc5:Thermal comfortposted by Konstantina Kalliakoudi on
Hello to all,
For Projects that are outside USA, in my case in Europe can I comply with Option 1? Also comply ASHRAE 55-2010?
Or is it necessary to comply with Option 2?
Condensate to a campus grey water system instead of being used on-site
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Bo White on
Our building is on a college campus and we plan to route all condensate to the campus grey water system. Does this qualify even though it is not being used on-site?
Cross-contamination prevention: dedicated exhaust system still required?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Luis Andrade on
Hi,
Project Boundary - Excluding ceiling work for HVAC and plumbing connections
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Tracy Marquis on
We are renovating spaces on the ground floor of an academic building. The primary renovation spaces are contiguous, however, there will be minor work in the ceilings, outside of the LEED boun