Forum quick links
MRc5 Required information
NC-2009 MRc5:Regional Materialsposted by Victoria Rios Esteve on
Hi everyone!
I´m pretty new at LEED certification process, so I will really appreciate your help.
MRc4 Required Information
NC-2009 MRc4:Recycled Contentposted by Victoria Rios Esteve on
Hi everyone!
I´m pretty new at LEED certification process, so I will really appreciate your help.
MRc2.2 Requiered information
NC-2009 MRc2:Construction Waste Managementposted by Victoria Rios Esteve on
Hi everyone!
I´m pretty new at LEED certification process, so I will really appreaciate your help.
IEQc4.1 Required information
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Victoria Rios Esteve on
Hi everyone!
I´m pretty new at LEED certification process, so I will really appreciate your help.
IEQc3.1 Required information
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Victoria Rios Esteve on
Hi everyone!
I´m pretty new at LEED certification process, so I will really appreciate your help.
Extended Producer Program meets Waste Management
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Mike Bahr on
This credit gives the option to use products that are purchased from a manufacturer that participates in an extended producer responsibility program to meet the requirements.
we c1
NC-v4 WEp1:Outdoor water use reductionposted by Maria Peralta on
Hello!
I have an enquiry regarding this credit.
usgbc leed online site very slow and times out
NC-v4 MPR1:Must be in a permanent location on existing landposted by Christopher Cowie on
why is the usgbc leed online site so slow? I can bearly work on line and the site keeps timing out.
Fire Station FTE
posted by Grace Rink on
Hello, the existing threads about calculating FTEs and peak occupants for fire stations do not seem to arrive at the same solution, and I haven't found any specific to v4, so I appreciate any guida