Forum quick links
Dates for 2020 Summit
posted by Jennifer Zakrzewski on
Hello Sustainable MEP Leaders!
BuildingGreen is already hard at work planning next year's MEP Summit. We are looking at venues in Denver, CO and dates in late May or early June.
LEED-BD+C Hospitality - MRc5 Option 2 for a modular building.
NC-v4 MRc5:Construction and demolition waste managementposted by Susan Di Giulio on
Our project is a hotel for which all guestrooms are being manufactured as modular units. This will certainly save waste, and we are interested in pursuing Option 2.
How can i assure compliance for low emmetting materials? A+ and ECOLABEL certification?
NC-v4 EQc2:Low emitting materialsposted by Sara BENLOUBA on
ECOLABEL and A+ certification are sufficient for compliance or we must also quantify VOC and Formaldehyde emissions of our project by measuring? I am lost on this credit.
Control monitoring in tenant spaces
CS-v4 EQp1:Minimum indoor air quality performanceposted by Ron Dean on
Hello,
Average flow rate
NC-v4 WEc2:Indoor water use reductionposted by Gustavo De las Heras Izquierdo on
Hallo, In the last version of the indoor water use calculator, which can be downloaded here:
Post-consumer recycled content vs pre-consumer recycled content - LEED V3 excel datasheet
NC-v4.1 MRc4:Material Ingredientsposted by Mateus Souki on
I am working on a project where I must choose the materials for the MRc4 credit - LEED V3 (gold certification).
Entryways systems in Retails places out the LEED certification
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Mauricio Ramirez on
Hello Dear I´m writing you because i have a doubt about the entryways systems in my project C&S v4.
Baseline: Data Center HVAC system
NC-v4 EAp2:Minimum energy performanceposted by Marica Marzari on
Hi All,
I'm modeling a Data Center that include Data Hall, offices, workshops and a lot of technical rooms.
How can I model the Baseline HVAC system? Because:
MRc2
NC-2009 MRc2:Construction Waste Managementposted by Victoria Rios Esteve on
Hi! We have a building in the process of certification which changed its initial contractor to another company.