Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

CO2-eq emissions reduction

Dear all, Iam working on an international project and I can find my country and all countries in the list of Energy Star target finder, so I wonder why projects outside the US can't fill the target finder part? I also need to know where to find the % of "CO2-eq emissions reduction" (that is required in the LEEDonline form) in the Target finder results?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 04/23/2014 - 13:01

If you select your country and go all the way through to the results do you get results? If you don't get results then you won't have a Target Finder score to report. There were relatively recent changes to TF and Portfolio Manager. One of them I noticed was that in TF there are many more project types than there used to be but when you select one not covered by TF you get a message indicating that it can't give you a score. So make sure to run it all the way through and do not rely on a list in the entry page. The CO2 reduction % should be in the results.

Fri, 12/13/2019 - 19:03

I'm on Target Finder right now, I added all necessary info about my project and, when I look at the results I see no CO2-eq emissions reduction for either Design or Target anywhere.  Where do you find those values?

Fri, 12/13/2019 - 23:16

It should be in the table at the bottom of the page. If you didn’t find it, print the pdf report using the hyperlink on the left side of the screen and it should be in the pdf report.       